My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE50693
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE50693
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:07 PM
Creation date
11/20/2007 2:36:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1993050
IBM Index Class Name
Permit File
Doc Date
10/22/1993
Doc Name
DELLACROCE GRAVEL PIT FILE M-93-050
From
EL PASO COUNTY PLANNING DEPT
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • 900K PRGE <br />6260 430 <br />Resolution No. 93-286, Land Use-79 <br />Page 4 <br />7. Topsoil stockpiles and visual screening berms shall be <br />revegetated or quick-seeded if Left undisturbed for more <br />than one year. <br />8. Portable toilets and potable water, satisfactory to the <br />E1 Paso County Department of Health and Environment, <br />shall be maintained on site for employees. <br />9. The hours of operation shall be no more than daylight <br />hours, 7:00 a.m. to 6:00 p.m., Monday through Saturday. <br />10. Prior to beginning operations, the applicant shall <br />provide to the E1 Paso County Planning Department copies <br />of an approved Colorado Department of Health Fugitive <br />Dust Emissions permit for this operation. <br />11. Within 180 days of approval, the applicant shall place <br />visible markers at the corners of the permitted mining <br />area. <br />12. All vehicles transporting sand and/or gravel off-site <br />shall be covered to prevent any material from blowing <br />and/or falling from the vehicle. The outside rails of <br />trucks shall be swept prior to exiting the site. Notice <br />of these regulations shall be prominently displayed. <br />13. No explosives shall be used in the extraction of <br />material from this site. <br />14. Reclamation of the disturbed areas of the west and south <br />high walls shall begin within six months of reaching the <br />Phase I pit floor grade or within six months of <br />beginning Phase II, whichever comes first. <br />NOTATIONS: <br />1. Special use approval includes conditions of approval and <br />the accompanying plot plan. No substantial expansion, <br />enlargement, intensification or modification shall be <br />allowed except upon re-evaluation and public hearing as <br />specified in the E1 Paso County Land Development Code. <br />2. The Hoard of County Commissioners may consider <br />revocation and/or suspension if zoning regulations <br />and/or special use conditions/standards are being <br />violated, preceded by notice and pui~iic nearing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.