My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO21894
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO21894
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:43:06 PM
Creation date
11/20/2007 2:35:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984063
IBM Index Class Name
Hydrology
Doc Date
9/19/1997
Doc Name
CERTIFICATION AUTHORIZATION TO DISCHARGE UNDER THE CDPS INDUSTRIAL GENERAL PERMIT FOR COAL MINING
Permit Index Doc Type
NPDES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART I <br />Page No. 8 <br />Permit No. COG-850000 <br />B. EFFLUENT LIMTCATIONS AND MONITORING REQUIREMENTS <br />2. Stormwater Manaeement Plan (SWMP) (continued) <br />3) S[ormwater Quality Controls <br />Each mining site covered by this permit shall develop a description of s[ormwater quality controls appropria[e <br />for that site, and implement such controls. The appropriateness and priorities of controls in the plan shall <br />reflect identified potential sources of pollutants at the site. The description of stormwater quality controls shall <br />address the following minimum components, including a schedule for implementipg such controls: <br />a. SWMP Administrator -The SWMP shall identify a specific individual or individuals within the mining <br />organvation who is respopsible for developing the SWMP and assisting the mine operazor in its <br />implementation, maintenance, and revision. <br />b. Materials Handline and Spill Prevm[ion -Where materials can impact stormwater runoff, BMPs that reduce <br />the potential for contamination shall be described. For exatpple, materials should be stored and handled in <br />covered azeas whenever possible to prevent contact with stormwazcr; fuels and other chemicals should be <br />stored within berms or secondary containment devices to prevent leaks and spills from entering stormwater <br />runoff. <br />c. Erosion and Sedimen[ Controls - Describe BMPs that will be used [o reduce erosion and preven[ sediment <br />delivery to State waters. These should include stntcmral (such as silt fences, sediment ponds, drop <br />structures, check dams) and non-structural (such as mulching and revegetation) methods. <br />Whenever a facility or a portion of a facility enters the cost-minine phase, it is likely that the overall <br />configuration of the site will r3tange considerably. Prior to the time when new vegetation becomes <br />established, the surface azeas will be subject to potentially significant erosion. The permittee will need to <br />take adequate measures in Orde[ [O minimi~r this erosion aS well as the erosion normally encouIIte[ed <br />during mining activi[ies. <br />d. Identification of Dischaz¢es other than Stormwater -The stormwazer conveyance system on the site shall be <br />evaluated for the presence of discharges other than stormwater, such as mine drainage, spoil springs, <br />sanitary waste, or process water of any kind. The SWMP shall include a description of the results of any <br />evaluation for the pttsenoe of discharges other than stormwater, the method used, the date of the <br />evaluation, and the on-site drainage points that were dirxtly observed during the evaluation. <br />b) Facility Inspections <br />Qualified personnel identified by the operator shall make a comprehensive inspection of their stormwazer <br />management system, at least twice per yeaz (in the spring and fall), except as provided in paragraphs d and e, <br />below. These comprehensive inspections must be documented and sn,n,na,;~rrl in the Annual Report (see Part <br />I.D.2. of the permit). <br />1) Material handling azeas, disturbed azeas, azeas used for material storage that are exposed to precipitation, and <br />other potential sources of pollution identified in the SWMP in accordance with Part LB.2.a)1) of this permit <br />shall be inspected for evidence of, or the potential for, pollutants mteting the drainage system. Structural <br />stormwa[er management measures, sediment and control measures, and other stntcmral pollution prevention <br />measures identified in the plan shall be observed to ensure that they aze operating correctly. A visual inspection <br />of equipment needed to implement the plan, such as spill response equipment, shall be made. <br />2) Based on the results of the inspection, the description of potential pollutant sources and pollution prevention <br />measures identified in the plan shall be revised az appropriate within two weeks of such inspection. Surh <br />revisions shall provide for implementation of any changes to the plan in a timely manner, but in no case more <br />than 90 days after the inspection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.