Laserfiche WebLink
<br />b. Wildlife <br />During the different phases of reclamation the new <br />and diversified revegetation will offer good <br />forage (especially in the winter when operations <br />will be curtailed)for the wildlife in the area. <br />It has been our experience that various wildlife <br />species will leave during construction but return <br />during the operations phase. No rare or endangered <br />species have been identified in the area. <br />c. Water <br />All surface water runoff will be controlled by <br />utilizing appropriate ponds, berms, ditches, etc. <br />Revegetation will retard soil erosion. During <br />postmining reclamation, care will be taken to <br />ensure minimal soil erosion and or disruption of <br />the hydrological balance. Some specific steps <br />will be heavy revegetation, gravel and rock in <br />steep areas, etc. <br />