My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO21841
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO21841
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:43:04 PM
Creation date
11/20/2007 2:33:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Hydrology
Doc Date
8/25/1992
Doc Name
SOMERSET MINING CO PN CO-0000132 MATERIALS CONTAINMENT PLAN
From
J E STOVER & ASSOCIATES
To
WQCD
Permit Index Doc Type
OTHER GROUND WATER
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Somerset Mining Company <br />. SPCC Plan <br />Page 4 <br />1.3 Proper cleanup methods shall be employed for the particular <br />materials spilled. <br />1.4 The Environmental Coordinator will advise as to the necessary <br />requirements for proper disposal. <br />1.5 The Mine Superintendent shall notify the Mine Manager in the <br />event of a spill of any kind. The following information shall <br />be provided: 1) material spilled, 2) approximate volume of <br />spill, 3) approximate time of occurrence, 4) area affected <br />by the spill, and 5) names of personnel involved in cleaning <br />up hazardous materials. <br />1.6 The Environmental Coordinator will advise as to proper <br />notification and disposal requirements. <br />1.7 When the approximate volume and type of material spilled is <br />determined, the Environmental Coordinator will notify the <br />following: 1) Colorado State Department of Aealth, 2) U. S. <br />Environmental Protection Agency, 3) other appropriate <br />governmental agencies, and 4) downstream water users (if <br />necessary). <br />1.8 Adequate construction equipment and personnel are maintained <br />• at the Somerset Mine to clean up any spill that may occur. <br />1.9 Additional equipment and/or personnel are available through <br />local construction contractors and other coal handling <br />facilities in the area should they be necessary. Refer to <br />Exhibit B. <br />2. Fuel Oil, Gasoline and Hydraulic Oil <br />2.1 Absorbent materials such as Oil-Dri, straw, sawdust, raga, or <br />earth shall be used to soak up any free oil. <br />2.2 All spilled fluid and fluid soaked materials shall be <br />collected and placed in barrels or other suitable containers <br />for proper disposal. <br />3. Transformer Oil <br />3.1 Absorbent materials such as Oil-Dri, straw, sawdust, rags, or <br />earth shall be used to soak up any free oil. <br />3.2 All spilled fluid and fluid soaked materials shall be <br />collected and placed in barrels or other suitable containers <br />of proper disposal. <br />3.3 Oil soaked earth shall be properly disposed of as a <br />contaminated material. <br />C~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.