Laserfiche WebLink
RECLAMATION PLAN -Exhibit "E" Part II (Continued) <br />STAGE SIX <br />1. Four acres are to be reclaimed as one stage in Stage Six. <br />2. Two arses will be reclaimed per year, thus lasting two years. <br />3. The Operator will start reclamation on the Southern boundary of Stage Six and <br />proceed to the Western boundary. <br />4. Stage Six will be reclaimed in the same method as Stage One (Pages <br />"E-4" and "E-5", Paragraph "9'). <br />5. The boundary along the East side will be reclaimed to a (3:1) three to one elope <br />as indicated on the reclamation plan map (Page "F-1"). <br />6. Refer to Reclama*.ion Stage Table (Page'E-19') for more details and overall picture. <br />7. All access roads in the affected area will be reclaimed according to the reclamation <br />plan guidelines. <br />8. The reclamation plan s±ages will be marked with yellow markers along the <br />reclan~ion Stage Six boundaries for easier interpretation so that the Contractor <br />wi.'.1 have no difficulty in staying within the reclam ation Stage Six boundary. <br />9. All access roads in the affected area will be reclaimed according to the reclamation <br />plan guidelines. <br />"E-11" <br />