My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE50056
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE50056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:54:48 PM
Creation date
11/20/2007 2:18:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985173
IBM Index Class Name
Permit File
Doc Date
9/9/1985
Doc Name
REGULAR 112 PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION PLAN -Exhibit "E" Part II <br />The following is a descrip*_ion of the method of reclamation for each stage of <br />reclamation. <br />STAGE ONE <br />1. First, A & S Construction Company will reclaim the existing pit, which is mined <br />out (3 acres) per the Reclamation Plan during the fall of 1985. <br />2. ~r ~ remove existing stockpiles and reclaim to quick-cower crop of Russian <br />Wild Rye (5 lbs. /acre) and Western Wheatgrass (5 lbs. /acre) in the fall o: 1985, <br />for area protection until mined, or farmed by landowner until mining begins ~'age'D-l6'~ <br />3, Next, remove strippings and reclaim the area with a rapid growth type of plant <br />cover of Russian Wild Rye (5 lbs. /acre) and Western Wheat grass (5 lbs. /acre) <br />in the fall of 1985 for area paobciim Lahl xrm~ed, or fam~ad bf }azxiowirs tahl nmmg 6egas (Page"D-]6' ~, <br />4. Ten acres are in stage one to be reclaimed. <br />5. After reclamation of the original three acres, reclamation will be handled on a <br />two acre per year basis. <br />6. The Operator will start reclamation in the old pit in the Southwest 1/4 of Stage <br />One and proceed to the Northeast 1/4 of Stage One and end in the SE 1/4 of Stage <br />One as shown on the reclamation map. (Page "F-1"). <br />7. The North boundary wad East boundary of Stage One will be reclaimed to a(3:1) <br />slope (Page "F-1"). <br />8. The length of time for this stage is five years. <br />9. Stage One will be reclaimed in the following manner: <br />a. (kie in. to four in. topsoil will be salvaged, stockpiled and replaced over the <br />affecte3 are4 .(page "F-1"). <br />"E-4" <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.