Laserfiche WebLink
MINING PLAN -Exhibit "D" (Continued) <br />STAGE #4 <br />1. First, the strippings stockpile found at the site will be removed and used as <br />fill for the old mined out area found in the existing pit during the fall of 1985. <br />Access roads and crusher are progressively moved along closely behind the <br />mining operation as required. <br />2. Stage Four consists of 12 acres which will be mined in increments of 2 acres <br />per year, thus lasting for 6 years. <br />3. Operations will start on the South boundary and proceed to the North Boundary <br />of stage four, as shown on map (Page "C-1") <br />4. Sand and gravel will be extracted in the same manner as indicated in Stage One, <br />(Pages D-2 and D-3, Paragraph 4), except that the topsoil and overburden <br />stockpiles will be located in the Northeast 1/4 of stage four. <br />5. No water impoundments are located at the site, and the water will be drained <br />naturally to the Southwest. Topography of the affected area will be a gentle <br />three to one (3:1) slope or less, so that very little erosion will occur. <br />6. Mining Plan stages will be marked with red markers along the mining stage <br />boundaries so that the contractor will have no difficulty staying within the <br />bounday. <br />7. Refer to Mining Stage Timetable (Page"D-16" of Mining Plan) for overall picture. <br />8. All access roads are included in the affected area. <br />"D - 6" <br />