Laserfiche WebLink
MINING PLAN -Exhibit "D" (Continued) <br />STAGE #5 <br />1. Access roads and crusher are progressively moved along closely behind the <br />mining operation as required. <br />2. Stage Five consists of 11 acres which will be mined in increments of 2 acres <br />per year, thus lasting for 5 1/2 years. <br />3. Operations will start on the East boundary of Stage Five and proceed to the West <br />boundary, ending on the North boundary, as shown on the map (Page "C-1"). <br />4. Sand and gravel will be extracted in the same manner as indicated in Stage One, <br />(Pages D-2 and D-3, Paragraph 4), except that the topsoil and overburden <br />stockpiles will be located in the Northeastern 1/4 of Stage Five. <br />5. There will be no water impoundments located at the site, and the water will be <br />drained naturally to the Southeast. The topography of the affected area will be <br />a gentle three to one (3:1) slope or less, so that very little erosion will occur. <br />6. Mining plan stages will be marked with red markers along the mining stage <br />boundary so that the contractor will have no difficulty in staying within the <br />mining stage boundary. <br />7. Refer to Mining Stage Timetable (Page"D-1H'of Mining Plan). for overall picture. <br />8. Access roads are included in the affected area. <br />"D-7" <br />