Laserfiche WebLink
<br />E. Within 200 foot River Setback (3 acres) <br />1. Backfill (32' depth} <br />2. Topsoil (6" depth) <br />3. Scarify <br />4. Seed <br />5. Reseed <br />F. Roads <br />1. Demo and remove, 9000 SF x 8" <br />2. Topsoil (6" depth) <br />3. Scarify <br />4. Seed <br />G. Processing plant (Equipment is portable and <br />would be removed by the operator) <br />1. Move the surge pile into the settling basin <br />2. Wash plant, remove concrete pad, 20' x 20' x l' <br />3. Asphalt plant, remove concrete pad, 80' x 20' x I' <br />4. Concrete plant, remove concrete pad, 50' x 20' x 1' <br />5. Shop, demo and remove, 2000 SF x 20' <br />6. Office, remove concrete footings <br />7. Scale, remove concrete base <br />8. Topsoil (6" depth) <br />9. Scarify <br />10. Seed <br />ll. Reseed <br />H. Lakeshore final graded with topsoil <br />1. Scarify <br />2. Seed <br />3. Reseed <br />!. Lakeshore Seeded <br />1. Reseed <br /> <br />Qty Units Unit Cost Cost <br />155,000 CY $ 1.25 $1 93,750.00 <br />2,420 CY $ 1.25 $ 3,025.00 <br />3 AC $100.00 $ 300.00 <br />3 AC $750.00 $ 2,250.00 <br />3 AC $750.00 $ 2,250.00 <br />Qty Units Unit Cost Cost <br />6000 CF $ 0.05 $ 300.00 <br />167 CY $ 1.25 $ 208.75 <br />0.2 AC $100.00 $ 20.00 <br />0.2 AC $750.00 $ 150.00 <br />Qty Units Unit Cost Cost <br />1000 CY $ 1.25 $ 1,250.00 <br />15 CY $ 65.00 $ 975.00 <br />60 CY $ 65.00 $ 3,900.00 <br />37 CY $ 65.00 $ 2,405.00 <br />40000 CF $ 0.05 $ 2,000.00 <br />8 CY $ 65.00 $ 520.00 <br />10 CY $ 65.00 $ 650.00 <br />15325 CY $ 1.25 $19,156.25 <br />27 AC $100.00 $ 2,700.00 <br />27 AC $750.00 $20,250.00 <br />9 AC $750.00 $ 6,750.00 <br />Qty Units Unit Cost Cost <br />2 AC $100.00 $ 200.00 <br />2 AC $750.00 $ 1,500.00 <br />0.7 AC $750.00 $ 525.00 <br />Qty Units Unit Cost Cost <br />0.7 AC $750.00 $ 525.00 <br />L-2 <br />