Laserfiche WebLink
<br />Description Item Cost <br /> <br />Disturbance Cost Total $ 783,600.00 <br />Contractor MOB/DEMOB(8.0%) $ 62,690.00 <br />Overhead (18.5%) $ 144,970.00 <br />Administrative (5.0%) $ 39,180.00 <br />Total Proposed Bond $ 1,030,440.00 <br />Disturbed Acreage (Acre) 61 <br />Bond Cost Per Acre ($/Acre) $ 16,890.00 <br />L-3 <br />