My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE49907
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE49907
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:54:44 PM
Creation date
11/20/2007 2:14:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000016
IBM Index Class Name
Permit File
Doc Date
5/31/2000
Doc Name
ADEQUACY RESPONSE DTD 5-24-00 MOBILE PRE MIX CONCRETE INC RIVERBEND PIT FN M-00-016
From
DMG
To
GREGG SQUIRE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Attachment -Revised Exhibit L, Reclamation Cost Estimate <br />The maximum area of disturbance was based on the point in time when it would be the most <br />expensive to reclaim the site. This point occurs during the backfilling for 3:1 slopes in Mining <br />Cell 1 and 2. Here the dewatering trench will be at its maximum length. The access road and <br />processing area will also contribute to the site disturbance. There will be shoreline under <br />reclamation at the south end of the property. Please refer to Table D-1 for a listing of disturbed <br />areas, which total 61 acres. This estimate will follow the same order as the Table D-1. <br />A. Backfilling Sediment Basin <br />1. Backfill (2' depth) <br />2. Topsoil (6" depth) <br />3. Scarify <br />4. Seed <br />5. Reseed <br />Qty Units Unit Cost Cost <br />12,900 CY $ 1,25 $1 6,125.00 <br />3,200 CY $ 1.25 $ 4,000.00 <br />4 AC $ 100.00 $ 400.00 <br />4 AC $ 750.00 $ 3,000.00 <br />1 AC $ 750,00 $ 750.00 <br />B. Active Mining.4rea (/S acres) <br />1. Liner -install, repair, or replace 20% <br />2. Pit Run Material to Armor Liner (2' depth) <br />Stripped Overburden and Topsoil (3.5 acres <br />within 1 S acres, the area ahead of mining) <br />3. Backfill (4' depth) <br />4. Topsoil (6" depth) <br />5. Scarify <br />6. Seed <br />7. Reseed <br />C. Topsoil and overburden stockpiles <br />1. Scarify <br />2. Seed <br />3. Reseed <br />D. Dewatering trench(30' depth, 2' width) <br />1. Backfill (30' depth) <br />2. Topsoil (6" depth) <br />3. Scarify <br />4. Seed <br />5. Reseed <br />Qty Units Unit Cost Cost <br />3,250 LF $ 77.90 $253,200.00 <br />25,000 CY $ 7.50 $187,500.00 <br />22,586 CY $ 1.25 $28,232.50 <br />2,800 CY $ 1.25 $ 3,500.00 <br />3.5 AC $100.00 $ 350.00 <br />3.5 AC $750.00 $ 2,625.00 <br />1 AC $750.00 $ 750.00 <br />Qty Units Unit Cost Cost <br />3 AC $100.00 $ 300.00 <br />3 AC $750.00 $ 2,250.00 <br />1 AC $750.00 $ 750.00 <br />Qty Units Unit Cost Cost <br />8,666 CY $ 1.25 $1 0,832.50 <br />145 CY $ 1.25 $ 181.25 <br />3 AC $100.00 $ 300.00 <br />3 AC $750.00 $ 2,250.00 <br />l AC $750.00 $ 750.00 <br />L-I <br />
The URL can be used to link to this page
Your browser does not support the video tag.