Laserfiche WebLink
<br />Mr. Gregg Squire <br />May 14, 1000 <br />Page 3 oj3 <br />between the edge of the pit and the top of the riverbank. The affidavit will be submitted <br />by May 151 of each year and will include a statement that the setback area will be <br />maintained during the period from April l51 to October IS'. <br />Comment 4 <br />The Reclamation Cost Estimate, Exhibit L, has been revised to include the cost of backfilling the <br />3-acre area at 32 feet average depth (155,000 cubic yards) to ensure a 200-foot setback from the <br />river during non-low flow periods. The revised cost estimate is included in the Attachment. <br />Sincerely, <br />TUTTLE APPLEGATE, INC. <br />William Schenderlein <br />Project Engineer <br />Enclosures <br />cc: TA File #99-138 <br />Weld County Clerk to the Board <br />Duane Bollig, Lafarge <br />List of Objectors and Other Interested Parties <br />