My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE49542
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE49542
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:51:27 PM
Creation date
11/20/2007 2:05:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
MR-13 Continued
Section_Exhibit Name
EXHIBIT 15 Part 2a
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />energy fuels coal, inc. <br />i~n'c~cw <br />one tabs center • Suite 2500 <br />1200 seventeenth street • darner, Colorado 80202 <br />February 10, 1987 <br />Yr. Randall P. Price <br />Colorado Y1ned Land Reclamation Division <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />(303) 623-8317 <br />twx 910-931.2561 <br />RE: Southfield Yine. Yid-Term Review - Bonding: File No. C-81-014 <br />Dear Yi. Pries: <br />We are in receipt of your mid-term permit review document o! <br />Colorado Permit Number C-81-014 for the Southfield Yine. We have <br />reviewed the document and its attachments and are currently <br />preparing our responses to all o! the concerns azpreseed is that <br />document with particular emphasis oa the two violations which <br />resulted. <br />Our review o! Section III. Bonding, resulted in questions <br />regarding how the reclamation bond was calculated and ita <br />adequacy determined. We are not familiar with the 'YORD Bond <br />Calculation Manual" gad the resulting calculations which were <br />performed in the review process. To more fully understand the <br />Pined Land Reclamation Division's calculation methodology, as <br />apparently outlined in the •YORD Bond Calculation Ysnual•, gad <br />how it applies to the bond for the Southfield Yiaa we are hereby <br />requesting that you send us copies o! the above referenced manual <br />and associated calculations which were performed in your <br />Southfield Yins bond review. <br />As mentioned above ws are currently preparing our responses <br />to the other concerns outlined in the mid-term review document <br />and will be submitting information in the very near future. It <br />you have questions regarding the requests o! this letter or any <br />concerns related to the mid-term review document please do not <br />hesitate to contact Yr. Allen S. Weaver or me at your <br />convenience. <br />. - Sin erely, /f <br />"~/ `/~ <br />David R. Gossett <br />Chia! Yining Engineer <br />• DRG/jav <br />cc: Yr. Al1aa 3. Weever <br />Yr. James T. Cooper <br />Yr. Art Garcia <br />bce: Yr. Richard A. Munson <br />
The URL can be used to link to this page
Your browser does not support the video tag.