My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE49542
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE49542
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:51:27 PM
Creation date
11/20/2007 2:05:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
MR-13 Continued
Section_Exhibit Name
EXHIBIT 15 Part 2a
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
energy fuels coal, inc. <br />wuIMNIE min• • po•1 oHla boa MY • Ibnno•,~wlon0o llY2E • (J67) 761d7Y5 <br />February 12, 1987 <br />Mr. Randall Price <br />Mined Land Reclamation Division <br />1313 Sherman St. <br />Denver, CO 80203-2273 <br />Re: Submittal of Responses to the Mid-Term Review <br />Your File No. C-81-014 <br />Dear Mr. Price: <br />Upon receipt of your mid-term review of the Southfield Mine Per- <br />mit, Energy Fuels Coal, Inc., has identified concerns with the <br />indicated time frame for response. The concern is with respect to <br />certain revisions within Section I only, all of which are required <br />for submittal by February 27, 1987• <br />• In Section I there are four items which, due to the magnitude of <br />work necessary to prepare a thorough response, cannot be submitted <br />by February 27th. These items are revisions to the Reclamation <br />Plan, Hydrology (items 1 and 2), and Subsidence (item 2). Re- <br />sponses to all other items in Section I can be submitted by <br />February 27th with a suppliment containing responses to the four <br />items above submitted on April 15, 1987. <br />We are presently working to abate the two violations resulting <br />from the mid-term review, the results of which will be soon forth- <br />coming. The items in Section IV involving permit re-organization <br />will be given careful consideration and accomplished in due time. <br />Please let me know if you have any concerns regarding the revision <br />of the submittal time table. We look forward to working through <br />all aspects of the mid-term review with you. <br />Sincerely, <br />.f2. <br />Allen S. Weaver <br />Mine Engineer <br />cc: D. Gossett, Denver <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.