Laserfiche WebLink
Colorado Department of Public Health and Environment <br />Air Pollution Control Division <br />-MINING OPERATIONS - <br />D. <br />OVERBURDEN STOCKPILE(S) <br />Maximum Stored At One Time n/a <br />Proposed Controls For Overburden Stockpile: <br />^ Watering <br />^ Chemical Stabilizer <br />^ Compacting Of Piles <br />^ Enclosures <br />^ Revegetation <br />^ Other (specify) <br />E. <br />F. <br />G. <br />H. <br />Tons <br />Times/Day <br />Page 3 of 6 <br />(Complete or Partial) <br />Revegetation Must Occur Within One Year Of Soil Disturbance <br />DRILLING <br />Number Of Holes Drilled Per Day: none <br />Number Of Holes Drilled Per Yeaz: <br />Proposed Controls For Drilling: <br />^ Water Injection <br />^ Chemical Stabilizer <br />^ Bag Collectors <br />^ Other (specify) <br />BLASTING <br />Number Of Blasts Per Day: none <br />Number Of Blasts Per Yeaz: <br />Type of Blasting Material Used: <br />Tons of Blasting Material Used: <br />Hours Of Emissions Per Day: <br />RAW MATERIAL REMOVAL <br />Maximum Tons Removed Per Day: none <br />Tons Removed Per Year. <br />Drop Height: Feet <br />Specify Moisture Content: %, (if known) <br />Proposed Controls For Raw Material Removal: <br />^ Moist Material <br />^ Water Spray <br />^ Other (specify) <br />RAW MATERIAL STOCKPILE(S) <br />Maximum Stored At One Time: n/a <br />Proposed Controls For Raw Material Stockpile: <br />^ Watering Times/Day <br />^ Chemical Stabilizer <br />^ Compacting Of Piles <br />^ Enclosures Type; (Complete or Partial) <br />^ Revegetation Revegetation Must Occur Within One Year Of Soil Dismrbance <br />^ Other (specify) <br />Revised September 2004 htto://www.cdohestate.co.us/anlstationary.aso <br />