Laserfiche WebLink
Colorado Department of Public Health and Environment <br />Air Pollution Control Division Page 4 of 6 <br />• -MINING OPERATIONS - <br />I. PROCESSING <br />Will processing (i.e., crushing, screening, etc.) occur on site? Yes <br />NOTE: ALL PROCESS EQUIPD'IENT REQLrIRES A SEPARATE PERMIT APPLICATION AND <br />APEN. <br />PRIMARY CRUSHING <br />Maximum tons crushed per yeaz: 37,500 Tons <br />Maximum tons crushed per hour: 200 Tons <br />Hours of crushing per day: 9 <br />Proposed Controls: <br />® Moist Material <br />^ Water Spray <br />^ Enclosure Type: <br />^ Other (specify) <br />SECONDARY CRUSHING <br />Maximum tons crushed per year: 37,500 Tons <br />Maximum tons crushed per hour: 200 Tons <br />Hours of crushing per day: 9 <br />Proposed Controls: <br />^ Moist Material <br />^ Water Spray <br />^ Enclosure Type: <br />^ Other (specify) <br />SCREENING/CLASSIFYING <br />Maximum tons screened per yeaz: 37,500 Tons <br />Maximum tons screened per hour: 200 Tons <br />Hours of screening per day: 9 <br />Proposed Controls: <br />® Moist Material <br />^ Water Spray <br />^ Enclosure Type: <br />^ Other (specify) <br />RESCREEN ING/CLASSIFYING <br />Maximum tons screened per year: n/a Tons <br />Maximum tons screened per hour: Tons <br />Hours of screening per day: <br />Proposed Controls: <br />^ Moist Material <br />^ Water Spray <br />^ Enclosure Type: <br />^ Other (specify) <br />J. CONVEYORS/TRANSFER POINTS <br />Tons Of Material Conveyed Per Year <br />Tons Of Material Conveyed Per Day <br />Proposed Controls <br />^ Enclosure Type: <br />^ Other (specify) <br />37,500 Tons. <br />1,500 Tons. <br />(Complete or Partial) <br />Number Of Transfer Points : 3 <br />Proposed Controls <br />^ Enclosure Type: <br />®Water Spray <br />^ Chemical StabIlizer <br />p Other (specify) <br />(Indicate On A Separate Diagram How Conveyor System Is Se[ Up) <br />(Complete or Partial) <br />Revised September 2004 h-Ptt ://www.cdahestate co.us/an/stationary.asn <br />