Laserfiche WebLink
Colorado Department of Public Health and Environment <br />Air Pollution Control Division <br />•' -MINING OPERATIONS - <br />ESTIMATED EMISSIONS <br />Year For Which Actual Data Applies: n/a <br /> <br /> <br />Pollutant Estimated Emissions <br />(tans/yr) at throughputs <br />requested <br /> <br />Acma] Emissions <br />From Data Year <br />Estimation <br />Method <br /> Controlled Uncontrolled <br />Particulate <br />PM- ] 0 <br />A. TOPSOIL REMOVAL <br />Maximum Tons Removed Per Day: 1225 <br />Tons Removed Per Year: 2450 <br />Proposed Controls For Topsoil Removal: <br />® Moist Material <br />^ Water Spray <br />^ Other (specify) <br />B. TOPSOIL STOCKPILE(S) <br />Maximum Stored A[ One Time: 2450 Tons <br />Proposed Controls For Topsoil Stockpi]e: <br />^ Watering <br />^ Chemical Stabilizer <br />® Compacting Of Piles <br />Times/Day <br />Page 2 of 6 <br />^ Enclosures Type: - (Complete or Partial) <br />^ Revegetation Revegetation Must Occur Within One Yeaz Of Soil Disturbance <br />^ Other (specify) <br />C. OVERBURDEN REMOVAL <br />Equipment Used For Removal: <br />Maximum Tons Removed Per Day By Dragline: <br />Tons Removed Per Yeaz By Dragline: <br />Number Of Scraper Hours Per Day: <br />Number Of Scraper Hours Per Yeaz: <br />Proposed Controls For Overburden Removal: <br />^ Moist Material <br />^ Water Spray <br />^ Other (specify) <br />Scraper, Dragline, or Both <br />n/a <br />n/a <br />n/a <br />n/a <br />Revised September 2004 httoa/www.cdohestate co.us/an/stationary.aso <br />