- The Tucson South- southwest cell will be filled with fines <br />- The Challenger Pit will have a slope liner installed around it <br />- The Baseline Mine will be reclaimed as a lake and wetlands <br />- The Tucson South- west cell will be surrounded by a slurry wall <br />To simulate the calibration conditions and above activities, eight scenarios and two sub scenarios were <br />devised. They are summarized in Table 3. <br />Scenario 1: Calibration -This is the situation encountered at the site during the investigation for this <br />project (late 2003- early 2004). The old (existing) Seltzer Well in the proposed Tucson South -west <br />cells is running and the southern part of the Rogers pit is being dewatered and mined. Water levels were <br />measured and used for calibrating the model. <br />Scenario la: Calibration -This is the situation during the middle of 2004. The southern portion of the <br />Rogers Pit is not being mined and has filled with water. No other activities have started. This scenario <br />was run for 90 days to allow comparison of the simulated rise of water levels with those measured in the <br />monitoring wells. The comparison showed general agreement. <br />Scenario 2: No Mining -This scenario is idenfical to la, except that it was allowed to run long enough <br />to achieve aestablish aquasi-equilibrium condition for each season. This scenario simulates hydrologic <br />conditions in the area while no activities are taking place. <br />Scenario 3: New Seltzer Well and Existing Conditions Base -This scenario serves as the comparison <br />base for all subsequent scenarios. The only difference between this scenario and scenario 2 is that the <br />old Seltzer well has been abandoned and replaced by the new well between the east cell and the South <br />Platte River. This scenario simulates the situation just prior to mining activities. <br />Scenario 4: Early Mining -This scenario simulates the first new mining activities in the area. The <br />southern portion of the Rogers Pit is being dewatered and mined, as is the Challenger Pit. <br />Scenario 5: East Cell Mining -This scenario simulates the installation of the east cell slurry wall and <br />dredge mining of the southwest cell. The southern portion of the Rogers Pit has been filled with fines <br />while the Challenger Pit and Baseline Mine are dewatering and mining. <br />Scenario 6: West Cell Mining and Post Mining -This scenario simulates the final mining activities in <br />the area. The slurry wall has been extended around the west cell, separating it from the alluvial aquifer. <br />Mining in the Challenger Pit is complete and the slope liner has been installed. The Baseline Mine and <br />southwest cell have been backfilled with fines and a part of the Baseline Mine has been turned into an <br />unlined lake. <br />Scenario 6max: West Cell Mining and Post Mining -This scenario is identical to Scenario 6, but the <br />number and output of the new Seltzer Wells has been increased to the maximum decreed output. <br />Scenario 7: East Cell Mining (Isolated) -This scenario simulates the mining of the east cell and <br />southwest cell without the influence of the Challenger Pit and Baseline Mine. The purpose of this <br />scenario is to determine the effects of only the east cell. <br />- 8 - August 2004 <br />I: V919_U19\TS GW Model\TS Report\TUaon SwN_Rpt Raft doc <br />