My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE48436
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE48436
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:50:24 PM
Creation date
11/20/2007 1:35:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000049
IBM Index Class Name
Permit File
Doc Date
6/28/2000
Doc Name
ANGIE PIT FN M-2000-049 112C PERMIT APPLICATION RECLAMATION COST ESTIMATE
From
DMG
To
J E STOVER & ASSOCIATES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TrucklLoader Team Work~t'd Task # : OSa • sheet 2 of 2 <br />Loading Tool Cvcle Time : Number o! loading tool passes required to fill truck : 3 passes <br />Excavators and front shovels -machine cycle time vs. job condition rating : NA <br />-selected value within basic rating : NA <br />Track loaders -material descr.: NA <br />-cycle time elements (min.) : Load : NA Maneuver : NA Dump : 0.100 <br />Wheel and track loaders -unadjusted basic cycle time (load, maneuver, and dump) : 0.525 minutes <br />Cycle Time Factors Loading Condition Description Factor (min.) Source <br />Material : Mixed material 0.020 (Cat HBJ <br />Stockpile : Conveyor or dozer pled 10 R. high and up 0.000 (Cat HBJ <br />Truck ownership : Common ownership of trucks and loaders -0.040 (Cat HBJ <br />Operaticn : Constant opera8on -0.040 (Ca! HB) <br />Dump target : Nominal target 0.000 (Cat HB) <br /> Net cycle time adjustment : -0.060 minutes <br /> Adjusted basic cycle time : 0.465 minutes <br />Net load time per truck (bulk of first loader pass completed during truck exchange) : 1.030 minutes <br />Truck Cvcle Time <br />Truck exchange lime: 0.50 minutes........ Adjusted for site altitude : 0.50 minutes <br />Truck load time: 1.030 minutes........ Adjusted for site altitude : 1.03 minutes <br />Truck maneuver and dump time: 0.90 minutes........ Adjusted for site altitude : 0.90 minutes <br />Truck travel (haul 8 return) time: <br />Road condition description :Firm, smooth, rolling, dirt or light suAaced, watered, maintained <br />Haul route <br />Road <br />seg. # Haul distance <br />/eef Grade <br />res. (°b) Rolling <br />res. (%) Total <br />resistance (%) Speed <br />/eef/minute Travel time' <br />(minutes) <br />1 4,500 0.00 3.00 3.00 2994 1.87 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route : Haul lime " : 1.87 <br />1 4,500 0.00 3.00 3.00 3360 1.59 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />ninutes <br />' M1rst antl last segm°nts atljusted for accelerauon/tlecelerauon Return time " 1.59 mIr1UIBS <br />•• Mme shown includes altiNdv adjustment Total truck cycle time : 5.89 minutes <br />Loading tool unit production : 582.35 LCY/hour...... Adjusted tar job effciency : 483.35 LCY/hour <br />Truck unit production : 151.17 LCY/hour...... Adjusted lorjob effciency : 125.47 LCY/hour <br />Optimal no. truckslloading tool : 4 trucks........... Selected no. trucks/loader : 4 trucks <br /> Adjusted hourly truck team production ~ 501.90 LCY/hr <br /> Adjusted hourly single truclNoader team production : 483.35 LCY/hr <br /> Adjusted hourly multiple truck/loader team production : 483.35 LCYIhr <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : 16.14 Hours <br />Unit cost : $0.683 /LCY Total job cost : $5,328 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.