Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Agency ar organization name :OMG <br /> <br />Task tl : OBa Slate : Colorado Permivjobil : M-2000.049 <br />Dale : 0628/2000 County : Monbose Abbreviation :none <br />User : ESS Site :Angle Pit Filename : M049-06a <br /> <br />Permit or other job action : New 112c Application <br /> <br />Task description : Spread topsoil hauled from Phase I stockpile <br /> <br />HOURLY EQUIPMENT COST Basic machine : Lat DeN (1996) Horsepower : 285 <br /> Blade type : Seml-Universal <br /> AHachment no. 1 : ROPE Cab Shift hasis: 1 per day <br /> AHachment no. 2 : 3-shank upper <br /> <br /> Utilization % Cost data source : (CRG) <br />Cost Breakdown : Ownership cost/hour : E41.10 NA <br /> Operating cosVhour: E6E.64 100 <br /> Ripper op. casUhaur: E0.00 0 <br /> Operator cosUhour: E23.12 NA <br /> Total unit cosUhour : E119.86 Total Heet cosvhour : 5119.86 <br />MATERIAL QUANTITIES--- ~-- ~_~ _ _ ~ ~ _~ ~ ~ ~ ~ - -~ ---- -~___-~ <br />Initial Svrell Loose <br />volume: 7,800 LCY factor : NA volume: 7,800 LCY <br />Source of qua ntity lake-oH :Reclamation plan commitment <br /> <br />Source of est. swell factor : NA <br /> <br />HOURLY PRODUCTION <br /> Jab Condition Correction Factors <br />Average push distance : 65 teal Source <br />Unadjusted howdy production : 1034 LCY/hr <br />Matedal consistenq description <br />1 mm emr4nilo <br />Average push gmdient : 25.00 % (negJ <br />Ave2ge site altitude: 6,570 feet <br />Material weight : 2,800 Ihs/LCY <br />Material weigh) description <br />cr~~- wr,,,~r r,m <br />Operator skill : 0.75 (avg <br />Material consistency : 1.20 (Cat h <br />Dozing method : 1.00 (gen <br />Visihiliry: 1.00 (avg <br />Job eRcienq: 0.83 (15hIN~ <br />Spoil pile : 0.60 (Intl-: <br />Push gradient: 1.52 (Lath <br />Altitude: L00 (Goth <br />Material weight' 0.82 (Lath <br />Blade type : 1.00 (S or <br />Net correction : 0.56 <br />Adjusted unit production : 577.33 LCY/hr <br />Adjusted Heel production : 577.J3 LCYlhr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : E0.208 /LCY <br />Total job lima : 1J.51 Hours <br />Total job cost : $1,619 <br />