Laserfiche WebLink
• <br />PROJECT IDENTIFICATION <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />• sheet 1 of 2 <br />Agency or organization name : DMG <br />Task # : 05a State :Colorado <br />Date : 06282000 County :Montrose <br />User : SSS Site :Angie Pit <br />Permit or other job action :New 112c Applicab~on <br />Task description :Load and haul topsoi <br /> <br />HOURLY EQUIPMENT COST <br /> ~ Ecuioment De <br />Permitlob # : M-2000-049 <br />Abbreviation .none <br />Filename . M049-05a <br />stockpile Irom Phase / to Phase ll <br />Shin basis : 1 per day <br />tCflpll0n <br />TrucWloatler team -Truck :Genedc 12-18 cy, 6x4 <br />-Loader :CAT 966E S.2 Std. V~R (1999) <br />Support equipment -Load area : NA <br />-Dump area : NA <br />Road maintenance -Motor grader <br />-Water truck <br />Cost Breakdown : TrucWLoader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader NA NA NA NA <br />%Utilization-machine : 96 100 NA NA NA NA <br />-Ripper aHachment : NA NA NA NA NA NA <br />Ownership cosOhour : $19.20 $28.54 NA NA NA NA <br />Operating cosOhour : $22.35 $26.17 NA NA NA NA <br />Ripper op. cosOhour : NA NA NA NA NA NA <br />Operator cosUhour : $21.55 $23.12 NA NA NA NA <br />Unit subtotals : 863.09 $77.82 NA NA NA NA <br />Number of units : 4 1 0 0 0 0 <br />Group subtotals : Work : $330.20 Support : $0.00 Maintenance : $0.00 <br />Initial <br />volume <br />Total work team cosUhour <br />IIAL QUANTITIES _ ~ ~ ~ -~ ~~ - -~ ~ ~~- <br />Swell Loose <br />7,800 LCY factor: NA volume <br />Source of quantity take-off : Reclamation Plan Commitment <br />Scurce of estimated swell factor : NA <br />Material purchase cost : $0.00 /LCY Total cost <br />HOURLY PRODUCTION <br />Truck Caoacit <br />$330.20 <br />7,800 LCY <br />$0 <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Material weight : 2, 800 pounds/LCY Struck volume : 12.00 LCY <br />Descr.: Clay -natural bed Heaped volume : 18.00 LCY <br />Rated payload : 48.000 pounds Average volume : 15.00 LCY <br />Payload capacity : 17.14 LCY Adjusted capacity : 15.00 LCY <br />Final adjusted t ruck capacity based on specific number of loader passes : 14.85 LCY <br />Loading Tool Capacity : Job Condition Corrections : Site altitude (R.) : 6,570 <br />Rated capacity (nom. heaped) : 4.500 LCY Truck Loader Source <br />Descr.: Other- mcWdiR mixtures (100-120%) Altitude adj.: 1.000 1.000 (Cat HB <br />Bucket fill factor : 1.100 Job efficiency : 0.830 0.830 (1 shiR/dal <br />Adjusted bucket capacity : 4.950 LCY Net correction : 0.830 0.830 <br />