Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Agenq or organization name : DMG <br /> <br />Task%: 04a State: Colorado PermiVobR:M-2000.049 <br />Data : 06282000 County : Monbose Abbreviation :none <br />User: SSS Sile:Angle Pif Filename:M049-04a <br /> <br />Permit or other job action : New 112c Application <br /> <br />Task description : Replaced stripped topsoil back on cut area o/reduced highwall <br /> <br />HOURLY EQUIPMENT COST Basic machine : Caf D8N (1996) Horsepower : 285 <br /> Blade type : Semi-Un/versal <br /> Adachmenl no. 1 : ROPS Cab Shifl basis : 1 per day <br /> Attachment no. 2 : 3-shank ripper <br /> <br /> Utilization Ya Cosl data source : (CRG) <br />Cost Breakdovm : Ownership cosgheur : $41.10 NA <br /> Operating cosUhour : $55.64 100 <br /> Ripper op. cosVhour: 50.00 0 <br /> Operator cosVhour: Y23.12 NA <br /> Total unit cosghour : 2119.86 Total Oeet cosUhour: 5119.86 <br />MATERIAL OUANTITIE9 - ~ ~ ~ - _- _ -- - ~ -- ~ ~---- - ---~~ --_ - _ _ _ <br />Initial Swell Loose <br />volume: 4,840 LCY factor : NA volume: 4,840 LCY <br />Source of quantity take-oft :Assume 3 acres Mg/nally stnpped In task Ola <br /> <br />Source of est. swell lector : NA <br /> <br />HOURLY PRODUCTION <br /> Job Condition Correction Factors <br />Average push distance : 65 lest Source <br />Unadjusted hourly production : 1034 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient : 25.00 % (negJ <br />Average Bile altitude : 6,570 feel <br />Malarial weight : 2,800 Ibs/LCY <br />Material weigh) description <br />C/a y -Natural bed <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Operator skill : 0.75 (avg <br />Malarial consistenry: 1.20 (Carp <br />Dozing method : 1.00 (gen <br />Visibility: 1.00 (avg <br />Job efOcienq: O.B3 (1shIN~ <br />Spoil pile : 0.60 (/nd: <br />Push gradient : 1.52 (Caf h <br />Altitude: 1.00 (Cott <br />Material weight : 0.82 (Call <br />Blade type : 1.00 (S or <br />Nel correction : 0.56 <br />Adjusted unit production : 577.33 LCY/hr <br />Adjusted neat production : 577.37 LCYIhr <br />Total job time : 8.38 Hours <br />Unit cost : $0.208 /LCY Total job cost : $1,005 <br />