Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Agenq or organization name : DMG <br /> <br />Task K: 03a Stale: COloratlo PermiVob#:M-2004049 <br />Date : 06282000 County :Montrose Ahbrevialion :none <br />User: SSS Site :Angle Pit Filename:M049-03a <br /> <br />Permit or other job action : New 712c Application <br /> <br />Task description :Cut and Till Hlghwall and wing walls In Phase ll <br /> <br />HOURLY EQUIPMENT COST Basic machine :Cal DBN (1996) Horsepower : 2B5 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : ROPE Lab Shift basis : 1 per tlay <br /> Atachment no. 2 :3-Shank upper <br /> Utilization % Cost data source : (CRG) <br />Cost Breakdown : Ownership cosVhour : E41.10 NA <br /> Operating cosghour: E55.64 100 <br /> Ripper op. cost/hour: E7.39 20 <br /> Operator cost/hour: E23.12 NA <br /> Total unit cosVhour: Y721.25 Total Oeel cosUhour: (121.25 <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume: 39,727 LCY factor <br />Source of quantity takeoff : 32'H x 1495'L <br />Source of est. swell factor : NA <br />Average push distance : 65 feel <br />Unadjusted hourly production : 1034 LCY/hr <br />Material consistenry description <br />Consolida fed s fackoile <br />Average push gradient : 12.50 % (negJ <br />Average silo altitude : 6,570 feel <br />Material weight : 3,250 Ihs/LCY <br />Material weight description <br />Grave/ - Pitiun <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : E0.298 /LCY <br />Loose <br />NA volume: 39,727 LCY <br />3118 2 - 32'H x 300'L wings cut and hlletl to 4:1 <br /> <br />Operator skill : <br />0.75 Source <br />(avg.) <br />Material consistency : 1.00 (Cat HB, <br />Dozing method : 1.00 (gen.) <br />Visibility: 1.00 (avg.) <br />Job eRciency: 0.83 (1shiNda <br />$p011 pile : 0.70 (Ind-ml) <br />Push gradient : 1.28 (Cef HB <br />Alldude: 1.00 (Cat HB <br />Material weight : 0.71 (Cal H8 <br />Blade type : 1.00 (S or U <br />Nel correction : 0.39 <br />Adjusted unit production : 407.41 LCYlhr <br />Adjusted 8ee1 production : 407.41 LCY/hr <br />Total job lime : 97.51 Hours <br />Total job cost . E11,823 <br />