Laserfiche WebLink
• CMLRB -Exhibit D <br />Mining Plea <br />Page 4 <br />DOWE FLATS PROJECT -LYONS, CO <br />MINING & RECLAMATION PLAN SUMIVIARY <br /> Hi-Cal 2nd Ridge 3rd Ridge 4th Ridge TOTAL. <br />Term in Years 25 25 25 25 25 <br />Production Tous 7,600,000 1,700,000 8,900,000 500,000 19,000,000 <br />Acres+ 170 56 104 6 336 <br />Cubic Yards of Production Rock 3,800,000 850,000 4,450,000 400,000 9,500,000 <br />Mine Waste is Cubic Yards++ 10,000,000 2,000,000 2,100,000 182,000 14,300,000 <br />• Ridges overlap; acreage given is for each ridge regardless of overla total acreage mine s 312. <br />• <br />++ Includes topsoil, unconsolidated overburden, and waste rock. Volumes shown are bank cubic yards. Bulking factors of 20 % <br />for unconsolidated overburden end 5096 for waste rock were used. The total volume of loose cubic yards placed on the reclaimed <br />surface i--------`20~ 000. <br />u <br />