Laserfiche WebLink
l J <br />• <br />~~~ ~' <br />EXHIBIT E -RECLAMATION PLAN ~~...ayr ea, <br />~7a ~>c~ ~ -1"I.~a. S~Uu r <br />Tvpe of Reclamation ~``~~Pr~.~ <br />The Dowe Flats reclamation plan has been developed with the following main objectives: wtti,'I.. n ~ <br />s+~~,~. <br />• Create the most diverse wildlife habitat possible; the diverse topography madbe' weiC ~"'~`*'" <br />possible by mining makes this objective particularly attractive. The opportunities ~• `~~ <br />to create "new" topography, establish woody vegetation in various parts of the <br />post-mining landscape, and take advantage of water entering the lower parts of <br />excavated azeas will greatly enhance the value of the azea to a variety of game <br />and non-game wildlife. Specifically, wildlife habitat conswction is directed <br />toward 1) establishment of raptor prey base comprised of prairie dogs, <br />lagomorphs, other small mammals, waterfowl, and non-game birds, 2) <br />establishment of habitat consistent with use as mule deer movement corridor and <br />winter range, 3) establishment of raptor roost, perch and/or nest sites, and 4) <br />establishment of riparian habitat useful as feeding, breeding, and refuge habitat <br />for a large variety of mammalian, avian, and herptile species. <br />• Reduce visual liabilities of the strong north-south lineaz nature of the mining <br />disturbance by introducing topographic grain at differing angles and providing the <br />distraction of varying vegetational texture and from. This necessitates <br />establishment of cross-pit topography as well as topography extending away from <br />the mine area to connect visually with adjacent natural topographic features, <br />thereby reducing the visual impact of the previous linear mining features <br />underlying the area. <br />• Construct a mosaic of vegetation that includes species and plant community <br />structures such as naturally occur and will tie in with landscapes of the azeas <br />adjacent to Dowe Flats on Rabbit Mountain and Indian Mountain. <br />In addition, the distribution of topographic features in the reclaimed landscape <br />(Exhibit F) has been developed in consideration of the possible conswetion of an <br />earthen dam across the azea mined as part of this project. Specifically, no <br />reclamation topography has been constructed within the footprint o e am or <br />the first seven y er that~a;med topographic features extend <br />• across p am footprint. <br />