Laserfiche WebLink
<br />Certification of Construction <br />of <br />Refuse Area <br />Sedimentation Pond <br />The limits of the construction area were staked and clearing of the vegetation <br />was completed. The trees and shrubs were hauled from the site. Topsoil was <br />salvaged to a depth of 12 - 16 inches and stockpiled at the refuse disposal area. <br />bsJ , J~~f <br />i <br /> <br />