My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE47866
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE47866
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:49:53 PM
Creation date
11/20/2007 1:19:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certifcation Report Phase IVa
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. All Work shall be constructed, monitored, and tested in compliance with requirements in the <br />Constmction Quality Assurance Plan (Section 01400.2). CONTRACTOR and <br />• MANUFACTURER shall participate and comply with all items in these SPECIFICATIONS and <br />requvements of the CQA plan. <br />B. CONTRACTOR shall ensure that geotextile MANUFACTURER has an internal product <br />quality control program that meets Contract requirements. <br />C. CONTRACTOR shall be awaze of all activities outlined in the Constmction Quality Assurance <br />Plan, and the CONTRACTOR shall account for these activities in the construction schedule. <br />D. CONTRACTOR shall assure that the geotextile is delivered to the site at least 14 calendaz days <br />prior to installation to allow sufficient time for confomumce testing, if necessary. <br />E. Geotextile rolls that do not meet the requirements of this SPECIFICATION will be rejected. <br />CONTRACTOR will be required to replace the rejected material with new material that <br />complies with the SPECIFICATIONS, at no additional cost to CC& V. <br />F. In order to prevent weather damaged geotextile from being placed, the following Quality <br />Assurance procedures shall be followed: <br />I. CONTRACTOR shall perform its Work and utilize sufficient ballast as necessary to <br />prevent wind uplift of the geotextile panels. <br />2. [f weather damage should occur, CERTIFYING ENGINEER shall determine if the <br />geotextile shall be repaired or replaced. Weather damage to the geotextile will include <br />tears and dirty fabric, as determined by the CERTIFYING ENGINEER. <br />• 3. Repair or replacement of the weather-damaged geotextile shall be completed by <br />CONTRACTOR at no additional cost to CC&V. <br />4. As determined by MANAGER and CERTIFYING ENGINEER, the geotextile panel <br />maybe rejected at no cost to CC&V. <br />1.04 DELIVERY, STORAGE, AND HANDLING: <br />A. Packing and Shipping <br />1. Geotextile shall be supplied in rolls wrapped in relatively impermeable and opaque <br />protective covers, with straps for unloading. <br />2. Geotextile rolls shall be mazked or tagged with the following information. <br />a. MANUFACTURER'S name <br />b. Productinfonnation <br />c. Rol] number <br />d. Batch of lot number <br />e. Roll dimensions <br />3. CONTRACTOR shall ensure that geotextile rolls are properly loaded and secured to <br />• prevent damage during transit. <br />Section 02777 Page 2 of 5 December 9, 1998 <br />Geotextile Golder Associates Revision 2 <br />ciao'~uoawaomcmrnerosmaeeer+us~nve~ommzooc <br />
The URL can be used to link to this page
Your browser does not support the video tag.