My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE47866
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE47866
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:49:53 PM
Creation date
11/20/2007 1:19:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certifcation Report Phase IVa
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.02 SEAMING AND TESTING EQUIPMENT: <br />• A. Seaming <br />1. Approved field seaming processes are hot shoe double fusion welding and extrusion <br />welding, when approved by CERTIFYING ENGINEER. Use double fusion <br />welding as primary method of seaming adjacent field panels. <br />2. CONTRACTOR shall maintain on-site a minimum of two spare operable seaming <br />appazatuses. <br />3. Seaming equipment shall not damage the geomembrane. <br />4. CONTRACTOR may use a hot air device ("Leister") to temporarily bond <br />geomembrane panels that are to be extrusion welded. <br />5. CONTRACTOR shall use extrusion welding appazatus equipped with gauges giving <br />temperature of preheat and extrudate at nozzle of apparatus. <br />6. Welding rods or beads used for extrusion welding shall have the same physical <br />properties as that used for the resin used in the manufacture of the type of <br />geomembrane that is being installed at the Cresson Project. <br />7. CONTRACTOR shall use fusion welding apparatus which are self-propelled <br />devices equipped with a gauge indicating temperature of heating element, and a <br />gauge indicating the speed of the welding apparatus. <br />. B. Vacuum Testing (for extrusion seam only) <br />The equipment shall consist of the following: <br />1. Vacuum box assembly consisting o£ rigid housing, transpazent viewing window, soft <br />neoprene gasket attached to bottom of housing or port hole and valve assembly, and <br />vacuum gauge. <br />2. Pump assembly equipped with pressure controller and pipe connections. <br />3. Rubber pressure/vacuum hose with fittings and connections. <br />4. Bucket of soapy solution. <br />5. Wide paint brush, or other means of applying soapy solution. <br />C. Air Pressure Testing (for double fusion seam only) <br />The equipment shall consist of the following: <br />Air pump (manual or motor driven), equipped with a pressure gauge, capable of <br />generating sustaining and measuring pressure between 25 and 30 psi and mounted <br />on a cushion to protect geomembrane. <br />2. Rubber hose with fittings and connections. <br />. 3. Sharp hollow needle, or other approved pressure feed device. <br />Section 02776 Page I 1 of 20 October 25, 2000 <br />Geomembrane Golder Associpfes Revision 8 <br />i'.1001220IW000\CERTREPoBOZWPPENUSNPPE\993-2099011161 RH DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.