My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE47866
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE47866
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:49:53 PM
Creation date
11/20/2007 1:19:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certifcation Report Phase IVa
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. An air pressure monitoring device. <br />I . PART 3: EXECUTION <br />3.01 SUBGRADE: <br />CONTRACTOR, on a daily basis, shall certify in writing that the surface on which the geomembrane <br />will be installed is acceptable. It will be the CONTRACTOR'S responsibility to maintain, protect, and <br />if required return, the subgrade in the condition that was originally accepted, prior to geosynthetic <br />deployment until accepted by CC&V, under criteria identified in Section 02200 as per the Bedding Fill <br />and Soil Liner Fill SPECIFICATIONS. <br />3.02 ACCEPTANCE: <br />CONTRACTOR shall retain all ownership and responsibility for the geomembrane until fmal <br />acceptance. The geomembrane shall be accepted by CC&V when all of the following conditions aze <br />met: <br />1. Installation is fmished. <br />2. Verification of the adequacy of all seams and repairs, including associated testing, is <br />complete. <br />3. Certification, including QC documentation is provided by CONTRACTOR to <br />MANAGER. <br />4. Recommended acceptance by MANAGER and CERTIFYING ENGINEER. <br />5. The entire PROJECT, including Drain Cover Fill placement and Diversion Channel <br />construction is completed. <br />3.03 ANCHOR TRENCH: <br />A. The anchor trenches shall be excavated to the lines, grade, and width shown on the <br />DRAWINGS, prior to geosynthetic placement. CERTIFYING ENGINEER shall verify that <br />the anchor trench has been constructed according to the DRAWINGS. <br />Slightly rounded corners shall be provided in the trench where the geomembrane adjoins the <br />trench so as to avoid sharp bends in the geomembrane. <br />B. The anchor trench shall be backfilled and compacted as approved by MANAGER, DESIGN <br />ENGINEER and CERTIFYING ENGINEER. Trench backfill material shall be placed in <br />eight (8) to twelve {12) inch thick loose lifts and compacted by wheel rolling with light, <br />rubber-tired or other light compaction equipment, as approved by CERTIFYING <br />ENGINEER. <br />Care shall be taken when backfilling the trenches to prevent any damage to the geomembrane. <br />At no time shall construction equipment come into direct contact with the geomembrane. If <br />damage occurs, it shall be repaired by CONTRACTOR prior to the completion of <br />backfilling, at no cost to CC&V. <br />C. Extend geomembrane into the anchor trench as shown in the DRAWINGS. The <br />geomembrane shall be seamed along the entire distance of the anchor trench to the termination <br />of the geomembrane sheet. <br />Section 02776 Page 12 of 20 October 25, 2000 <br />Geomembrane Golder Associates Revision 8 <br />~:wo~zzmwaomc~creu;rosozuaeEnvswae~so-za9voznb~ns uoc <br />
The URL can be used to link to this page
Your browser does not support the video tag.