My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE47866
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE47866
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:49:53 PM
Creation date
11/20/2007 1:19:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certifcation Report Phase IVa
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. CONTRACTOR shall repay damage resulting from handling and transport of <br />geomembranes at no additional cost to CC&V. If irrepazable, in the opinion of <br />- CERTIFYING ENGINEER, damaged materials shall be replaced at no additional <br />cost to CC&V. <br />C. Storage and Protection <br />1. MANAGER will provide azea for on-site storage of the geomembrane rolls from time <br />of delivery until installation. <br />2. The storage and handling of the materials is the responsibility of CONTRACTOR <br />from the time the materials aze manufactured until the time the completed installation is <br />accepted. CONTRACTOR is responsible for preparing the storage location and for <br />the protection of the materials from the elements (e.g. ultraviolet light, moisture, <br />temperatwe, etc.). <br />3. After CONTRACTOR has removed material from storage, CONTRACTOR shall <br />protect geomembrane from puncture, dirt, grease, water, moisture, mud, mechanical <br />abrasion, excessive heat and other sources of damage. <br />4. CONTRACTOR shall preserve integrity and readability of the geomembrane roll <br />labels, and store the rolls such that MANAGER and CERTIFYING ENGINEER <br />have access to the package slips or roll labels for each roll to verify roll acceptance. <br />5. The rolls shall be stored on a prepared surface (not wooden pallets) and should not be <br />stacked more than two rolls high. <br />1.05 SITE CONDITIONS: <br />. A. Geomembrane Deployment <br />1. Do not proceed with deployment at an ambient temperature below 14° F or above <br />100° F unless otherwise authorized, in writing, by MANAGER, DES[GN <br />ENGINEER and CERTIFYING ENGINEER Temperature monitoring shall be <br />performed by the CQA Monitor. <br />2. Do not deploy during precipitation, in the presence of excessive moisture (e.g. fog, <br />dew), in an area of ponded water, or in the presence of excessive winds. <br />3. Do not undertake deployment if weather conditions will preclude material seaming on <br />same day as deployment. <br />B. Seaming <br />1. Normal Weather Conditions <br />Normal seaming procedures may take place if the following weather conditions exist: <br />a. Ambient temperature between 35° F and 100° F. <br />b. Dry conditions, i.e., no precipitation or other excessive moisture, such as fog <br />or dew. <br />c. No excessive winds. <br />. 2. Adverse Weather Conditions <br />Section 02776 Page 6 of 20 October 25, 2000 <br />Geomembrane Golder Associates Revision 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.