My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE47866
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE47866
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:49:53 PM
Creation date
11/20/2007 1:19:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certifcation Report Phase IVa
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
calibrated within 60 days prior to the tensiometer arriving on-site for testing field <br />samples. <br /> <br />E. Tn order to prevent wind damaged geomembranes from being placed, the following Quality <br />Assurance procedures shall be followed: <br />CONTRACTOR shall perform its Wotk and utilize sufficient ballast as necessary to <br />prevent wind upliR of the geomembrane panels. <br />2. If wind damage should occur, CERTIFYING ENGINEER shall determine if the <br />gomembrane shall be repaired or replaced. Wind damage to the gomembrane will <br />include wrinkles, creases, and tears, as determined by CERTIFYING ENGINEER. <br />3. Repair or replacement of the wind-damaged geomembrane shall be completed by <br />CONTRACTOR at no additional cast to CC&V. <br />4. As determined by MANAGER and CERTIFYING ENGINEER, the gomembrane <br />panel maybe rejected at no cost to CC&V. <br />1.04 DELIVERY, STORAGE, AND HANDLING: <br />A. Packing and Shipping <br />1. Labels on each roll delivered to Site shall identify the following. <br />1 1 <br />L. J <br />a. MANUFACTURER'S name <br />b. Product Identification <br />c. Thickness <br />d. Roll number <br />e. Batch or lot number <br />f. Panel number (when applicable) <br />g. Roll dimensions <br />2. CONTRACTOR shall ensure that geomembrane rolls aze properly loaded and secured <br />to prevent damage during transit. <br />3. CONTRACTOR shall protect geomembrane from excessive heat, cold, puncture, <br />cutting, or other damaging or deleterious conditions. <br />4. CONTRACTOR shall ensure personnel responsible for loading, transport and <br />unloading of geomembrane are fully aware of the consequences of damage to <br />geomembrane, and aze familiar with handling and transport constraints imposed by <br />MANUFACTURER. <br />5. Geomembrane delivered to the project shall be protected by a relatively impermeable <br />and opaque protective cover, with individual straps for unloading. <br />B. Acceptance at Site <br />CQA Monitor shall perform inventory and surface inspection for defects and damage of <br />all geomembrane rolls upon delivery. <br />2. CONTRACTOR shall unroll and inspect any geomembrane roll that maybe damaged <br />below surface. <br />Section 02776 Page 5 of 20 October 25, 2000 <br />Geomembrane Golder Associates Revision 8 <br />ItQazZU)wwmcea"IftF.Poetl1WPPENDS WPPE199}209902]]61RS.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.