My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE47866
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE47866
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:49:53 PM
Creation date
11/20/2007 1:19:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certifcation Report Phase IVa
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. The Installation Superintendent shall have installed or supervised, at a minimum three <br />installation projects that entailed the installation of at least a total of 1,000,000 square <br />feet of the type of geomembrane that is being installed at the Cresson Project. <br />4. Actual seaming shall be performed under the direction of a Master Seamer (who may <br />also be the Installation Superintendent) who has seamed a minimum of 1,000,000 <br />square feet of the type of geomembrane that is being installed at [he Cresson Project, <br />using the same type of seaming apparatus specified for the Work. <br />5. The Installation Superintendent and/or Master Seamer shall be present whenever <br />seaming is performed. <br />C. Quality Assurance Program <br />1. All WORK shall be constructed, monitored, and tested in compliance with the <br />requirements of the Construction Quality Assurance Plan (Section 01400.2). <br />CONTRACTOR and MANUFACTURER shall participate in and comply with all <br />items in these SPECIFICATIONS and requirements of the CQA plan. <br />2. CONTRACTOR shall ensure that each geomembrane MANUFACTURER that <br />supplies materials to this project has an internal product quality control program that <br />meets SPECIFICATIONS. <br />3. During manufacturing of the geomembrane, samples of geomembrane shall be removed <br />for laboratory testing to ensure compliance with this SPECIFICATION. Conformance <br />sampling and testing will be performed in accordance with the Construction Quality <br />Assurance Plan. <br />4. CONTRACTOR shall assure that the geomembrane is delivered to the site at least ]0 <br />calendaz days prior to installation. CONTRACTOR will provide required Quality <br />Control information ]0 calendar days prior to geosynthetics being delivered to the <br />Cresson project and on delivery of geosynthetics to the Cresson project. <br />5. Geomembrane rolls that do not meet the requirements of this SPECIFICATION will be <br />rejected. CONTRACTOR shall replace the rejected material with new material that <br />conforms to [he SPECIFICATION requirements, at no additional cost to CC& V. <br />6. CONTRACTOR shall ensure [hat all personnel performing geomembrane seaming <br />operations are qualified by experience or by successfully passing seaming tests (see <br />Article 3.08(D) of this section). MANAGER reserves the right to reject any welding <br />technician whose performance is unsatisfactory. <br />7. INSTALLER'S Superintendent and QC Inspector shall attend the pre-construction <br />meeting. <br />D. Field Samples <br />1. Geomembrane sampling and testing shall be conducted m accordance with the project <br />SPECIFICATIONS for the following: <br />a. trial seam testing (Article 3.07 of this Section) <br />b. destructive seam testing (Article 3.09 of this Section) <br />• 2. CONTRACTOR shall maintain on-site a minhmm~ of one spaze operable tensiometer <br />and provide documentation indicating that all tensiometers used at the project were <br />Section 02776 Page 4 of 20 October 25, 2000 <br />Geomembrane Golder Associates Revision 8 <br />twmumwaaovocraeeoeozwev©unswer~ast-zossmnb~rsa.ooc <br />
The URL can be used to link to this page
Your browser does not support the video tag.