My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE47866
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE47866
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:49:53 PM
Creation date
11/20/2007 1:19:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certifcation Report Phase IVa
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.06 FILL PLACEMENT: <br />• A. The following general guidelines shall be followed except as noted elsewhere in this Section. <br />No fill materials shall be placed until the foundation and subgmde preparations have <br />been completed as specified herein, in Article 3.05 of this Section. The procedures for <br />fill placement shall be approved by MANAGER and CERTIFYING ENGINEER <br />prior to start of fill placement. <br />2. No brash, roots, sod, frozen material, or other deleterious or unsuitable materials shall <br />be incorporated in the fills. The suitability of all materials intended for use in the fill <br />shall be subject to approval by MANAGER and CERTIFYING ENGINEER. Fill <br />placement shall be temporarily stopped by CONTRACTOR due to weather <br />conditions, if materials and installafion do not meet the SPECIFICATIONS, at no cost <br />to CC&V. Fill shall not be placed upon frozen material, such as snow or ice. <br />3. If the surface of the prepared foundation or the surface of any layer of the fill is too dry <br />or too smooth to bond properly with the layer of material to be placed thereon, it shall <br />be moisture-conditioned and/or worked with harrow, scarifier, diso, or other suitable <br />equipment to provide a satisfactory bonding surface before fill material is placed <br />thereon. If the surface of the prepared foundation or the rolled surface of any layer is <br />excessively wet for fill materials to be placed thereon, it shall be removed and allowed <br />to dry or worked with a harrow, scarifier, disc, or other suitable equipment to reduce the <br />moisture content to an acceptable level or meet project specificationsas determined by <br />MANAGER and CERTIFYING ENGINEER. It shall then be compacted before the <br />next layer of fill material is placed. Determination of such dry or wet conditions shall <br />be made by CERTIFYING ENGINEER. <br />• 4. The distribution of materials shall be such that the fill is free from voids, lenses, <br />pockets, streaks, or layers of material differing substantially in texture or gradation from <br />the surrounding material. The material of a fill shall be as described in Article 2.01 of <br />this Section. <br />5. Unless otherwise approved by MANAGER and CERTIFYING ENGINEER, the <br />entire fill surface shall be at or neaz the same elevation at all times during constmction. <br />At all times daring constmction, the surface of the 511 shall be graded and maintained <br />by the CONTRACTOR to prevent ponding of water and to allow for storm water <br />drainage. <br />6. Except as otherwise specified or approved by MANAGER and CERTIFYING <br />ENGINEER, the CONTRACTOR shall dump and spread fdl in such a manner so that <br />no excessive gaps are left between successively-dumped loads of materials. The fill <br />shall be leveled prior to compaction by means of a dozer or grader, or other suitable <br />approved equipment, to obtain a surface free from depressions. <br />7. Except in areas approved by MANAGER and CERTIFYING ENGINEER where <br />space is limited or otherwise specified, CONTRACTOR shall place fill by routing the <br />hauling and spreading units approximately parallel to the axis of the fill. As faz as <br />practical, hauling units shall be so routed that they do not follow in the same paths, but <br />split their tracks evenly across the surface of the fill to enhance compaction. <br />8. CONTRACTOR shall apply water required for moisture conditioning on the fill or in <br />the borrow areas. <br />• CONTRACTOR shall maintain fill materials within the moisture content range <br />required to permit proper compaction to the specified density with the equipment being <br />Section 02200 Page 7 of 17 March 22, 2000 <br />Earthworks Golder Associates Revision 7 <br />I1 W~2203WOOUCFATAEP0863W PPEND541PPED2200A'IDOC <br />