My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE47866
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE47866
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:49:53 PM
Creation date
11/20/2007 1:19:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certifcation Report Phase IVa
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
used. The moisture content of the fill materials, prior to and during compaction, shall <br />• be uniform throughout each layer of the material. <br />Prior to mixing of wet and dry material on the fill to obtain the proper moisture content, <br />approval shall be obtained from CERTIFYING ENGINEER Mixed material shall <br />have a uniform distribution of the moisture content prior to placement on the subsequent <br />lift. <br />When materials spread on the fill are too dry for proper compaction, CONTRACTOR <br />shall spray water on each layer of the fill and shall work the moisture into the fill by <br />harrowing or other approved means, until a uniform distribution of moisture is obtained. <br />Material that is too wet for proper compaction, as determined by CERTIFYING <br />ENGINEER, shall be removed from the fill and/or spread out and permitted to dry, <br />assisted by discing and harrowing or mixing in dry material when permitted by <br />CERTIFYING ENGINEER, if necessary, until the moisture content is reduced to an <br />amount suitable for obtaining the specified degree of compaction, at no cost to CC& V. <br />9. After each layer of fill material has been placed, spread, and moisture-conditioned, the <br /> layer shall be compacted by passing compaction equipment over the entire surface of <br /> the layer a sufficient number of times to obtain the required density, as specified herein. <br /> Compaction shall be accomplished with equipment and by methods approved by <br /> CERTIFYING ENGINEER. If such equipment or methods are found unsatisfactory <br /> for the intended use, CONTRACTOR shall replace the unsatisfactory equipment with <br /> other types or adjust methods until proper compaction is achieved. <br /> Prior to placement of a subsequent lift, the previous lift shall be thoroughly scarified to <br /> a nominal depth of 2-inches to provide good bonding between lifts. Scarification shall <br /> be accomplished by discing, inking with a grader, or an alternative method approved by <br />• CERTIFYING ENGINEER. <br />10. The CQA Monitor will measure the ambient air temperature on an hourly basis. If the <br /> ambient air temperature is less than thirty-two degees Fahrenheit for more than one <br /> hour (1) over [he preceding twenty-four (24) hours, the CQA Monitor will measure the <br /> temperature of the fill to determine if the fill is frozen. "Frozen" is defined as a mean <br /> temperature of thirty-two degrees Fahrenheit (320F) or less. The CQA Monitor will <br /> measure the temperature at a depth of three (3) inches and six (6) inches, recording the <br /> lowest of the two. Six (6) measurements will be taken per acre, and if the average is <br /> below thirty-two degrees Fahrenheit (32OF), the fill will be considered frozen. If the <br /> fill is determined to be frozen the CONTRACTOR may either remove and replace the <br /> frozen fill or wait until subsequent temperature monitoring indicates the fill is unfrozen, <br /> at no cost to CC& V. <br />11. Ore sideslope and end berth fill shall be compacted using a method specification. <br /> Previously leached ore material shall be regraded to meet the grades and dimensions <br /> shown on the DRAWINGS. The Bedding Fill subgrade surface will be prepazed as <br /> identified in Section 2200 of the SPECIFICATIONS. <br />B. Structural Fill <br />1. Areas to receive Stmctural Fill will include, but are not limited to, slope reductions, and <br /> miscellaneous site grading. <br />2. CONTRACTOR shall condition Stmctural Fill to a moisture content that allows <br /> compaction to the required density and [hat results in a firth, unyielding surface capable <br />• of allowing the movement of vehicles and equipment over the surface without causing <br /> rutting or other deleterious effects. <br />Section 02200 Page 8 of 17 March 22, 2000 <br />Earthworks Golder Associates Revision 7 <br />rwmzzonoaorncmrrteruwzwerr~vnsweremzoon~ ooc <br />
The URL can be used to link to this page
Your browser does not support the video tag.