My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE47866
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE47866
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:49:53 PM
Creation date
11/20/2007 1:19:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certifcation Report Phase IVa
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• C. CONTRACTOR shall grade all excavations to ensure grades are maintained to provide <br />adequate drainage at all times. Work shall be suspended by CONTRACTOR when, in the <br />opinion of MANAGER and CERTIFYING ENGINEER, the site is overly wet, muddy, or <br />otherwise unsuitable for proper maintenance, until directed otherwise by MANAGER, at no cost <br />to CC&V. <br />D. In excavations where Structtrral Fill or Select Stmctural Fill is to be placed on slopes steeper than <br />3H:1V, horizontal benches shall be excavated into the slope to allow fill to be placed in <br />horizontal lifts. The CONTRACTOR shall continuously bench and key embanlmtent material <br />into the existing material a minimum of 2 feet. <br />E. The CONTRACTOR will be responsible for the safety of temporary construction slopes. <br />CONTRACTOR shall inspect all temporary and permanent open-cut excavations on a regulaz <br />basis for signs of instability. Should signs of instability be noted, CONTRACTOR shall <br />immediately undertake remedial measures and shall notify MANAGER immediately. <br />Permanent cut slopes shall be left in smooth, safe, and stable condition at the end of the workday. <br />F. CONTRACTOR shall fmal grade excavations within the valley leach facility to establish <br />positive drainage to the Pregnant Solution Storage Area. In no case will depressions or bowls be <br />permitted in the valley leach facility area. <br />G. CONTRACTOR shall conduct all excavation and shoring operations in compliance with <br />applicable MSHA, Colorado State and Federal government laws and regulations. <br />3.05 SUBGRADE: <br />• A. The MANAGER and CERTIFYING ENGINEER will inspect and approve the exposed <br />subgrade prior to any fill or Soil Liner being placed. CQA Monitor will confirm that the surface <br />of the subgrade is smooth and free of debris, grade stakes, angular rocks, roots, branches, <br />vegetation, mud, ice, or frozen material. If the subgrnde is determined to be frozen, using the <br />criteria identified in Item 3.06.10 of Section 2200, the CONTRACTOR may either remove and <br />replace the frozen subgrade or wait unfit subsequent temperature monitoring indicates the fill is <br />unfrozen, at no cost to CC&V. The subgrade shall have no sudden sharp or abmpt changes in <br />grade. <br />B. CONTRACTOR is responsible for maintaining subgrades in a condition satisfactory to <br />CERTIFYING ENGINEER. CONTRACTOR shalt protect prepared subgrades, including <br />previously approved subgrade, from weather, construction equipment, or other factors as outlined <br />in Part 3.06 of the SPECIFICATIONS. Subgmde surfaces, including previously approved <br />subgrade, that become softened or otherwise unsuitable for placement of fill, shall be repaired to <br />CERTIFYING ENGIiYEER's and MANAGER'S satisfaction, at no cost to CC&V. <br />C. Prior to placement of fill materials, CONTRACTOR shall scarify all m-situ materials [o a depth <br />of 6-inches, moisture condition, and recompact the subgrade. Compac6ve effort shall be <br />adequate to obtain a minimum of 95 percent of maximum dry density as determined by the <br />standazd Proctor test (ASTM D698) for the particulaz fill material Moisture conditioning shall <br />be adequate to achieve a uniform moisture and density. In rock areas, the CONTRACTOR <br />shall prepaze the subgrade by removing loose rock fragments until competent foundation material <br />is encountered as approved by CERTIFYING ENGINEER. <br />D. If the underlying material is unsuitable to pemilt proper compaction of the subgrade, <br />CONTRACTOR shall loosen, aerate (or excavate and remove), and recompact the subgrade <br />. until the top layer can be compacted as required. The recompacted surface shall then be <br />scarified, as needed, to provide a good bond between the foundation and fill materials. <br />Section 02200 Page 6 of 17 March 22, 2000 <br />Earthworks Golder Associates Revision 7 <br />1:1W~3203Wi00~CF.RTREP0602W PPEND5~,1PPEb2300R] DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.