My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE47866
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE47866
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:49:53 PM
Creation date
11/20/2007 1:19:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certifcation Report Phase IVa
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
be easily remedied, such as unsatisfactory test results, will be dealt with directly between the CQA <br />• Monitor, INSTALLER ,and/or CONTRACTORS. <br />If there is a disageement among the DESIGN ENGINEER, CERTIFYING ENGINEER and/or <br />MANAGER that can not be resolved among themselves, MANAGER shall present the matter to <br />CC&V with MANAGER related recommendations and CC&V shall decide the matter with such <br />decision being final. <br />PART 4.0 DEFICIENCIES <br />When deficiencies (items that do not meet project requirements) aze discovered, the CQA Monitor shall <br />itrtmediately determine the nature and extent of the problem and notify the INSTALLER or <br />CONTRACTOR If unsatisfactory test results identify a deficiency, additional tests will be performed <br />to define the extent of the deficient area. <br />The INSTALLER or CONTRACTOR shall correct the deficiency to the satisfaction of the CQA <br />Monitor. If the CONTRACTOR is unable to correct the problem, the CQA Monitor will notify the <br />MANAGER and CERTIFYING ENGINEER who will assist in problem resolution. If the solution <br />involves a design revision, the DESIGN ENGINEER shall also be contacted. <br />The corrected deficiency shall be retested and/or approved by the MANAGER and CERTIFYING <br />ENGINEER before any additional related work is performed by the INSTALLER or <br />CONTRACTOR. All retests and related documentation shall be recorded by the CQA Monitor and <br />included in the final Constuction Certification Report. <br />PART 5.0 MEETINGS <br />• This section identifies and describes the meetings to be held during the coarse of the construction. <br />Meetings shall be held in order to clearly define conswction activities and goals in order to facilitate <br />construction. <br />5.01 PRECONSTRUCTION MEETING: <br />The MANAGER will hold a preconstruction meeting at the site prior to the start of construction. The <br />DESIGN ENGINEER, MANAGER, CERTIFYING ENGINEER, CQA Monitor, INSTALLER, <br />CONTRACTOR, and others designated by the MANAGER shall attend this meeting. The purpose of <br />this meeting will be to: <br />- review the construction DRAWINGS, CQA Plan, and project SPECIFICATIONS; <br />- define the responsibilities of each party; <br />- define lines of communication and authority; <br />- review method of documentation, testing procedures, and reporting inspection data; <br />- establish testing protocols and procedures for correcting and documenting construction <br />deficiencies; and, <br />- discuss any changes that may be needed to ensure that construction will be completed in <br />compliance with the design. <br />. - This meeting will be documented by the MANAGER or his designee and copies <br />distributed to all parties. <br />Section 01400.2 Page 4 of 1 l <br />Geosynthetic CQA Plan Golder Associates <br />1.\Op\2303\00 W\CERTRF.Po802\APPENDSW PPEW IA002RS.DOC <br />March 22, 2000 <br />Revision 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.