Laserfiche WebLink
5.02 PROGRESS MEETINGS: <br />• The MANAGER will hold a daily progress meeting, either before the start of work or at the <br />completion of work. At a minimum, this meeting will be attended by the CQA Monitor, INSTALLER <br />and CONTRACTOR. The purpose of this meeting will be to: <br />- review all the previous day's accomplishments and activities; <br />- review scheduled work location and activities for the day; and, <br />- discuss any problems or potential construction problems. <br />- This meeting will be documented by the CQA Monitor. <br />5.03 DEFICIENCY MEETINGS: <br />Special meetings will be held, as needed, to discuss potential problems or deficiencies. At a minimum, <br />these meetings will be attended by the CQA Monitor and INSTALLER or CONTRACTOR. If the <br />problem relates to a design issue, the MANAGER, DESIGN ENGINEER and CERTIFYING <br />ENGINEER should also be present. The meeting will be documented by the CQA Monitor. <br />PART 6.0 GEOSYNTHETICS CONSTRUCTION QUALITY ASSURANCE <br />Construction of the valley leach facility or specified geosynthetics must be in compliance with the <br />• design plans and SPECIFICATIONS. CC&V shall implement a CQA monitoring and testing program <br />to ensure construction compliance by the CONTRACTOR. The quality assurance program shall <br />consist of reviewing CONTRACTOR quality control submittals, material conformance testing, <br />construction monitoring and testing. <br />The types of geosynthetics used in the valley leach facility constmction include polyethylene pipe, <br />geomembrane and geotextile. These geosynthetics aze defined in the project SPECIFICATIONS. <br />Prior to and during construction, these geosynthetics shall be sampled and tested to determine if they <br />meet project SPECIFICATIONS. All tests shall be performed in a geosynthetics laboratory approved <br />by the MANAGER. <br />6.01 REVIEW QUALITY CONTROL SUBMITTALS: <br />Prior to geosynthetic installation, the CQA Monitor shall review the INSTALLER'S quality control <br />submittals to evaluate or confirm that these materials meet project requirements. The CQA Monitor <br />shall review the QC submittals that are outlined in Section 2776 (Geomembrane) and Section 02777 <br />(Geotextile) of the SPECIFICATIONS. <br />6.02 GEOMEMBRANE CONFORMANCE TESTING: <br />Prior to geosynthetic installation, the CQA Monitor shall obtain samples of the geomembrane for <br />conformance testing to confirm that these materials meet project requrements. The conformance <br />testing frequency shall be at a rate of 1 test per 150,000 square feet. Samples shall be taken across the <br />entire width of the roll and shall not include the first 3 feet. The samples shall be 3 feet wide by the roll <br />width. The CQA Monitor shall mark the machine direction, roll number on the sample, and date the <br />sample was obtained and forward the sample to a third party geosynthetic laboratory. As a minimum, <br />the following conformance tests shall be conducted; with project requirements outlined in <br />Section 02776, Articie 2.01: <br />Section 01400.2 Page 5 of 1 ] Mazch 22, 2000 <br />Geosynthetic CQA Plan Golder Associates Revision 5 <br />1\W\3I~)1D000\CERTREP0802NPPENDSIAPPE1014002RS.DOC <br />