My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE47799
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE47799
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:49:49 PM
Creation date
11/20/2007 1:18:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1989074
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
2.05.4(2)(c) BACKFILLING & GRADING
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 2.05.4(2)(c) Backfilling and Grading (Continued) <br />line located fifty (50) feet short, and parallel to the Raton <br />Natural Gas Co. pipeline, final reclamation will take place. If <br />sufficient topsoil is unavailable locally to reclaim the surface <br />addition topsoil will be taken from the storage area. <br />The restored Phase 1 surface area will exhibit a somewhat <br />shrunken surface area due to the coal bed being removed. There <br />will not be any overburden or topsoil left standing or stored. <br />To commence the Phase 2 operation Engleville Gulch will bs <br />moved into its new, permanent channnel. Construction will start <br />on the No. 2 collection ditch and the trough to transfer the <br />water across the diverted channel to collection ditch No. 1 <br />will be installed. After initial mining to remove the topsoil, <br />• overburden, and coal in and around the old cnannel backfilling <br /> can begin. Here again, it way be necessary to momentarily <br />double stack overburden to open an area large enough to mine the <br />coal and allow the equipwent to work. <br />The drag line will backfill overburden into the wined out <br />Phase 2 pit in the save wanner as it did in Phase 1. As back- <br />filling and contouring of the spent spoil takes place topsoil <br />will be added from that salvaged in front of the drag line and <br />from the originally stockpiled material. At the completion of <br />Phase 2 pit all of the topsoil stored in the stockpile area will <br />be redistributed over reclalwed coal stockpiles and any other <br />disturbed area where it is needed. Thera will not be any <br />topsoil or overburden piles remaining. <br />• <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.