My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE47768
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE47768
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:49:47 PM
Creation date
11/20/2007 1:17:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987113
IBM Index Class Name
Permit File
Doc Date
6/25/1987
Doc Name
APPLICATION FOR A MLR PERMIT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT E <br />RECLAMATION PLAN AND TIMETABLE <br />1 <br />The operator has selected a reclamation plan of Buffer zone and <br />' non-critical wildlife habitat as the most versatile and protective <br />use of the land. Present land uses are Buffer zone and non-critical <br />~' wildlife habitat. <br />RECLAMATION PBRFOR!lANCE STANDARDS <br />' The operator intends to operate the site in compliance with the <br />Reclamation Perf ormance Standards of Rule 6. <br />Grading will be performed to create a final topography appropriate <br />to the planned future land use. When backfilling is necessary, <br />the operator will replace overburden and waste materials in the mined <br />' area and will insure that heavy equipment used for this purpose is <br />compacting the earth sufficiently to achieve good stability. All <br />' grading will be done in a manner to control erosion and to protect <br />areas outside the affected land from slides or other damage. All <br />grading will be completed as soon as feasible after the mining <br />process. Any ref use will be handled and disposed of in a manner <br />' , that will control unsightliness and protect the drainage system ~yc~, <br />from pollution. <br />There are no acid-forming or toxic materials involved in this <br />' operation. There will be no drill or auger holes left on the <br />land. Portals to underground operations will be closed properly and <br />' reclaimed. The slopes to be revegetated will be capable of being <br />traversed by farm machinery. <br />'' This is a dry operation. Water is not a consideration of <br />standards in this operation. <br />' The operator has observed only noncritical wildlife and <br />grazing domestic animals on the affected land at this time. <br />' In removing the topsoil and overburden to teach the mineral <br />deposit, the topsoil and overburden will be segregated and stockpiled <br />separately. If the topsoil is not replaced in a backfilled area <br />' within a short enough time to avoid deterioration (loss by erosion), <br />,a.~;c.~i~ ~ ~~.~..~.~.,~~, ,cam.-~ <br />' 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.