My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE47574
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE47574
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:49:35 PM
Creation date
11/20/2007 1:13:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004031
IBM Index Class Name
Permit File
Doc Date
7/28/2004
Doc Name
First Adequacy Comment Response
From
Tetra Tech RMC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 <br />TETRA TECH RMC Mr. Berhan Keffelew <br />July 27, 2004 <br />D) During the pre-operational inspection, the operator agreed to have the slurry <br />wall design approved by SEO and have it in place prior to any mining activity <br />taking place and post the 20% warranty to DMG. <br />The slurry wall will be designed consistent with SEO standards and it will be <br />installed prior to mining on the portion of the site that is west of the Fulton <br />Ditch. Preliminary specifications are attached. Aggregate Industries will <br />bond 20% per DMG standards. Please see the cost estimate included in item <br />VIII below. <br />IV) EXHIBIT "E"RECLAMATION PLAN <br />A) It is the understanding of the Division that the post mining land use for the <br />proposed area is a lined a reservoir and that the substitute water supply plan <br />will be approved and a copy of the approval submitted to the Division before <br />any water is exposed in the proposed permit area. <br />Your understanding is correct. <br />B) Under the soil information, bore holes indicated a range between 1 feet to 10 <br />feet, but you only committed to placing 6 inches. The Division request that you <br />commit to placing a minimum of I2 inches of overburden/ top soil over the <br />entire 28.1 acres. <br />The operator will place a minimum of 12 inches of overburden top soil over <br />the entire 28.1 acres of disturbance in Phase 3. <br />V) EXHIBIT "F"ADEQUATE <br />Noted <br />VI) EXHIBIT "G' WATER INFORMATION <br />A) Since the 100 year flood plain is with in the proposed permit area, the <br />operator must be in compliance with all the requirements of Urban Flood <br />Drainage Control. <br />The operator will be in compliance with the Urban Drainage and Flood <br />Control District Requirements. The applicant has had apre-application <br />meeting with Urban Drainage and Flood Control District and Adams County. <br />A Flood Plain Use application has been submitted to the County for this <br />project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.