DRAFT <br />A. Prepare detailed schedule of all constmction operations and procurement to be reviewed by the <br />Engineer prior to commencing constmction. <br />No work is to begin at [he site until Engineer's acceptance of the Construction Progress Schedule and <br />Report of delivery of equipment and materials. <br />1.02 FORMAT AND SUBMISSIONS <br />A. Prepare construction and procurement schedules in a graphic format suitable for displaying schedule <br />and actual progress. <br />B. Submit two copies of each schedule to [he Engineer for review. <br />The Engineer will return one copy to the Contractor with revisions suggested or necessary for <br />coordination of the Work with the needs of the Engineer or others. <br />1.03 CONTENT <br />A. Construction Progress Schedule <br />Show the complete Work sequence of constmction by activity and location. <br />2. Show the dates for the beginning and completion of: <br />a. Slurry wall construction in maximum 10 working day increments. <br />b. Earthwork operations. <br />c. Testing. <br />Show projected percentage of completion for each item as of the first day of the month. <br />B. Report of delivery of equipment and materials <br />1. Show delivery status of critical and major items of equipment and materials. <br />2. Include a schedule which includes the critical path for Shop Drawings, tests, and other <br />submittal requirements for equipment and materials. <br />1.04 PROGRESS REVISIONS <br />A. Submit revised schedules and reports when changes are foreseen or when required by [he Engineer. <br />B. Show changes occurring since previous submission. <br />1. Actual progress of each item to date. <br />2. Revised projections of progress and completion. <br />C. Provide a narrative report as needed [o define: <br />1. Anticipated problems, recommended actions, and their effects on the schedule. <br />2. The effect of changes on schedules of others. <br />END OF SECTION <br />7/04 Section 01310 -Page 2 of 2 <br />