DRAFT <br />DIVISION 1 -GENERAL REQUIREMENTS <br />SECTION 01330 -SURVEY DATA <br />1.01 SURVEY REQUIREMENTS <br />A. Construction Stakeout: <br />1. Perform construction stakeout with qualified, competent personnel <br />2. Engineer has established all temporary benchmarks as found on the Drawings. Base all <br />vertical measurements on established control. <br />3. Stake the slurry trench along its alignment at all beginning and ends of all curves and at 50- <br />foot stations. <br />4. Enter all survey notes and construction stakeout cut notes into bound, hard cover field books <br />furnished to Contractor by Engineer. <br />B. All survey data developed by Contractor in performing surveys required by the Work will be available <br />[o the Engineer for examination throughout the construction period. <br />1.02 SUBMITTALS <br />A. Submit a copy of the cut sheets to Resident Project Representatives aminimum of 36 hours in <br />advance of construction activities so that lines and grades maybe checked prior to construction. <br />B. Submit to the Engineer all field books, notes, cut sheets and other data developed by the Contractor in <br />perfomung surveys along with other documentation required for Final Acceptance. <br />END OF SECTION <br />7/04 Section 01330 -Page 1 of 1 <br />