Laserfiche WebLink
PROJECT COSTS <br />The following costs were developed based upon one conventional method of <br />construction using existing available geotechnical, survey and hydraulic <br />data and could vary greatly when final design is completed. Alternate <br />methods of construction such as reinforced earth or the development of a <br />cut off trench will be considered during final design. <br />ESTIMATID PROJECT COSTS <br />Description <br />Care of water & unwatering <br />reservoir & foundation <br />Excavation, unclassified <br />stripping, dam ~ abutments <br />Excavation, unclassified <br />stripping, borrow areas <br />Quantity/IInit Unit Price Amount <br />Lump Sum $10,000.00 $ 10,000.00 <br />2,000 C.Y <br />1,500 C.Y. <br />Excavation, unclassified in <br />borrow areas & transport to <br />dam site 46,000 C.Y <br />Excavation, unclassified <br />of enlarged spillway 28,500 C.Y <br />Filter Blanket 4,000 C.Y. <br />i-5 <br />• <br />$ 1.10 $ 2,200.00 • <br />$ 1.00 $ 1,500.00 <br />$ 2.50 $115,000.00 <br />$ 2.00 $ 57,000.00 <br />$ 18.00 $ 72,000.00 <br />