My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE47474
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE47474
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:49:29 PM
Creation date
11/20/2007 1:10:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
6/2/2006
Section_Exhibit Name
Exhibit 74 Monument Dam -Minnesota Reservoir Structure Inventory
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT COSTS <br />The following costs were developed based upon one conventional method of <br />construction using existing available geotechnical, survey and hydraulic <br />data and could vary greatly when final design is completed. Alternate <br />methods of construction such as reinforced earth or the development of a <br />cut off trench will be considered during final design. <br />ESTIMATID PROJECT COSTS <br />Description <br />Care of water & unwatering <br />reservoir & foundation <br />Excavation, unclassified <br />stripping, dam ~ abutments <br />Excavation, unclassified <br />stripping, borrow areas <br />Quantity/IInit Unit Price Amount <br />Lump Sum $10,000.00 $ 10,000.00 <br />2,000 C.Y <br />1,500 C.Y. <br />Excavation, unclassified in <br />borrow areas & transport to <br />dam site 46,000 C.Y <br />Excavation, unclassified <br />of enlarged spillway 28,500 C.Y <br />Filter Blanket 4,000 C.Y. <br />i-5 <br />• <br />$ 1.10 $ 2,200.00 • <br />$ 1.00 $ 1,500.00 <br />$ 2.50 $115,000.00 <br />$ 2.00 $ 57,000.00 <br />$ 18.00 $ 72,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.