Laserfiche WebLink
Base Course Under <br />• Rip Rap 3,500 C.Y. $ 12.00 $ 42,000.00 <br /> Rip Rap, Type B 8,500 C.Y. $ 15.00 $ 127,500.00 <br /> Compacted Backfill 46,000 C.Y. $ 1.00 $ 46,000.00 <br /> Movement Monuments 3 Ea. $ 500.00 $ 1,500.00 <br /> Access Road (Forest Service) 1 L.S. $10,000.00 $ 10,000.00 <br /> 12" Corrugated Metal Pipe 220 L.F. $ 50.00 $ 11,000.00 <br />• Mortar Lining Existing <br /> Outlet Pipe 430 L.F. $ 50.00 $ 21,500.00 <br /> Hydraulic Outlet Control Valve 1 L.S. $10,000.00 $ 10,000.00 <br /> Inlet Works 6 Trash Rack, 12" 1 L.S. $15,000.00 $ 15,000.00 <br /> Outlet Valve Control Enclosure 1 L.S. $ 9,300.00 $ 9,300.00 <br /> Estimated Construction Cost $5 51,500.00 <br />Engineering, Legal, Administration <br />Costs - 20% of Construction Costs $110,300.00 <br />• <br />i-6 <br />