My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE46965
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE46965
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:49:03 PM
Creation date
11/20/2007 12:59:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990114
IBM Index Class Name
Permit File
Section_Exhibit Name
EXHIBIT A LEGAL DESCRIPTION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Page 1 of 8 <br />ATTACHPIEI7T lJUMBER 1 OF <br />EXHIBIT D <br />GENERAL SPECIFICATIOIJS OF THE <br />IfII4IIJG PLAN <br />I. Purpose of the Material Site: <br />A. General Use: <br />7.. Pit run for road or diY.e subbase. <br />?. Classified or crushed material for road surfacing or for crater <br />conveyance channel lining, etc. <br />3. Reject 3/9 minus with plasticity and crusher fines ample to <br />qualify for road surfacing while crushing clean chips for asphalt <br />pad or hot sealing a highway. <br />B. Final location of produced materials: <br />1. Highway wort. under contract with Federal, State, or Local agency. <br />2. Dirt road surfacing on county roads in the vicinity, generally <br />within fifteen (15) miles. <br />3. DiY.es and canals or other water conveyance channels. <br />C. Tenure: <br />1. The pit will be used annually for an indefinite period of time. <br />Staged production and reclamation will mitigate the long term <br />affects. Estimated life of the lower pit is twenty-five (25) <br />years and of the upper pit is forty (40) years. <br />a. The produced stockpiles will be removed as materials are <br />needed. Under some "contracts" removal vrill be immediate. No <br />stockpiles that are over 12' high will remain for over three <br />years. <br />II. Reclamation Materials: <br />A. Topsoil: <br />Ample topsoil (approximately 12") will (See Item D herein) be removed <br />and stockpiled prior to removal of the underlying materials (subsoil, <br />spoil, and production materials). Stockpiles will be placed out of <br />the way of excavation and production stockpiles. They will not exceed <br />twelve (12) feet in height and will be buffered with enough aria to <br />-10- <br />
The URL can be used to link to this page
Your browser does not support the video tag.