My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE46965
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE46965
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:49:03 PM
Creation date
11/20/2007 12:59:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990114
IBM Index Class Name
Permit File
Section_Exhibit Name
EXHIBIT A LEGAL DESCRIPTION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ <br />.J <br /> <br />Fage 4 of 8 <br />III. Fines: <br />A. If the pit does c+ot produce enough fines to meet material <br />specifications, the operator may haul in such fines from an approved <br />site (by AOR). <br /> <br />IV. Rater Control: (Show on Alining Plan Map.) <br />A. Tie operator rill be responsible to construct any structures necessary <br />to cou[rol water and its destructive torces. Describe here any known <br />structures needed for live water diversions and/or impoundments. <br />V. Equiprt~ent to be used: <br />A. ]:n excavation: r -• i .~ r ,~ yaades __. <br />B. ?or reclamation: Fxont end. 1 aAar (`rawlnr ,1 ~,y~_ , di nor drill ____ . <br />C. For hauling: Bump Truc4s, Single ' T r __...... <br />n., 1 Tr nhnr /Trail or ~~c ___._._ <br />VI. Other facilities/operations: <br />A. Asphalt plants will enter the site as needed. A staging area for this <br />will be delineated on the Alining Plan Itap. <br />B. Gravel washing may be required at times and will require AOR <br />approval. A staging area, water source, and water disposal area will <br />be delineated on the Alining Plan A]ap. Modern production equipment can <br />produce "clean" gravel and chips without washing and is tlce preferred <br />method. ' <br />C. Weigh scales, ingress and egress roads, gates, toilets, and other <br />facilities will be shoxn on the llining Plan Ilap and will clot impact <br />immediate excavation areas adversely. <br />D. Subsequent locations must be approved by the AOR. <br />-13- <br />
The URL can be used to link to this page
Your browser does not support the video tag.