My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE46851
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE46851
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:48:57 PM
Creation date
11/20/2007 12:57:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985112
IBM Index Class Name
Permit File
Doc Date
8/13/1985
Doc Name
ED LOLOFF CONST INC -FN M-85-112
From
NELSON ENGINEERS
To
MLRD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />James B. McArdle <br />Sr. Reclamation Specialist <br />Mined Land Reclamation Division <br />August 13, 1985 <br />Page Four <br />3. The operator is prepared to waste part of the <br />overburden from Mining Area II against th south <br />embankment. Ten percent of the overburde from MA-II <br />(9690 cubic yards) would provide a 5:1 sl a along <br />the south embankment for a distance of 150 feet. <br />4. The operator intends to follow the resoili g, <br />mulching, fertilization, and seeding reco endations <br />pertaining to grasses, as provided by the oil <br />Conservation Service. The operator does n t intend <br />to selectively strip or stockpile topsoil ~y soil <br />unit, as suggested, due to the complex bou daries of <br />the soil units in the area. The operator ~ntends to <br />follow SCS recommendations with regard to ree and <br />shrub planting, with the qualifications st ted in <br />the next paragraph. The shoreline will be graded to <br />a 3:1 slope from at least five feet above o ten <br />feet below the ultimate water surface. I <br />5. The SCS suggests species, locations, and s~acing for <br />tree and shrub planting in Exhibit AA of t e <br />application. The operator intends to follow the SCS <br />suggestions, except where their timing wil <br />interfere with mining operations. All pla~tings <br />will be completed by the time of final rec amation. <br />C. Exhibit G - Water Information <br />1. After due consideration, the operator has ~ecided to <br />mine the deposit wet, in the manner descri ed above <br />in paragraph A-2. The operator foresees n need for <br />dewatering ponds. <br />2. No dewatering operations are contemplated. <br />3. We will review the comments of the Divisio#~ of Water <br />Resources as soon as they become available` <br />(Note: Paragraph labels "D" and "E" were inadvert ntly <br />skipped in MLRB review. No content is mis~ing). <br />
The URL can be used to link to this page
Your browser does not support the video tag.