<br />a depth of 10 feet below usual water surface level. .The lake bottom <br />between the shore and the island will be shallow to support aquatic <br />vegetation. <br />6. We appreciate and accept your suggestion of a seed mix. <br />C. EXfIIBIT F -Reclamation Plan Map <br />Area C's elevation will not change substantially. The only reclamation <br />at Area C will be seeding when topsoil removal has been crmy~leted. A <br />revised "Basic Reclamation Costs" sheet (page K-1) is enclosed which <br />includes cost of seeding Area C. <br />D. E~iIDIT i -Soils Information <br />Topsoiling costs on page K-1 are based on replacing 8 inches of topsoil. <br />The depth of soils replacement reflects Flatiron's conformance with the <br />landowner's request. Our lease agreement prevents removal of topsoil <br />from the site as a product. All topsoil available for replacsnent will <br />be used on the site. <br />E. EXEiIBIT J -Vegetation <br />The landowner states that this 149 acre farm currently supports approxi- <br />mately 100 eras for one nnnth per year. <br />F. EXFiIBTP K -Reclamation Costs <br />One of the complicating factors about this permit is that same of our work <br />on site is more agricultural land improvement than mining. Further, one <br />parcel of land is proposed only as a possible last phase of mminrnnq, <br />The following breakdoHm may clarify the situation. Only 41.8 acres is <br />proposed for mining at this time (Areas A and B). As you .pointed out, <br />seeding will need to be done on an additional 1.75 acres (Area C) fn7n which <br />sane topsoil will be raroved. The haul roads will remain as farm roads <br />at the landowner's request, thus replacing roads he lost when Interstate <br />70 was built. An additional 10.6 acres is designated as a future possible <br />mining area but no mining or reclamation is now proposed for it. To <br />summarize, 42 (41.8 rounded to 42.0) acres will be leveled, 37.5 acres <br />will be topsoiled (42.0 minus 4.5-acre lake), 24.5 acres of pasture <br />(22.7 acres plus 1.75 acres in Area C) and 14.8 acres of terrace slope <br />will be reseeded. Anew page K-1, Basic Reclamation Costs, is sutmitted <br />to reflect the changes in cost due to the change in seed mix and the <br />reseeding of 1.75 acres of Area C. <br />Our effort at this site will be to keep as much land as possible in <br />agricultural production at any given time. Can you please let me know <br />what procedures the MLRB now uses to figure bonds so that only the corst <br />case of actual disturbance is bonded? We should like to have this agreed <br />upon wall before the February Board meeting. <br />I hope this information adequately responds to your concerns about the Chambers application. <br />Sincerely, <br />~i.....T~'-~ <br />(Mrs,aret Winter <br />