Laserfiche WebLink
<br />F. ~: <br />'~_.~J <br />BASIC RECLAMATION COSTS BROKEN DOWN AS FOLLOWS `I ~ r~ 1 ~ 14~) <br />1JIP1r=D L=•.h!~ R~CL ;:,:,;TION <br />Colo. Czpt. c' :~aiural desesrccs <br />A. LEVELING <br />1. 4840 Yd.2/acre at $.02/Yd.2 $100.00/acre <br />2. Acreage affected: 42 acres $4,200.00 <br />3. Equipment to be used: Blade <br />B. TOPSOILING <br />1. 2472 Yd.2/acre at $.55/Yd.2 $1359.00/acre <br />2. Acreage affected: 37.5 acres 50,985.00 <br />3. Equipment to be used: Loader/Dump <br />Truck/Blade <br />C. RESEEDING <br />Pasture: <br />1. 15 lb. seed at $31.00/acre (maximum <br />cost) 31.00 <br />2. Labor and Equipment Cost: $35.00/acre 35.00 <br />3. Acreage affected: 24.5 acres 1,617.00 <br />Area C = 1.75 acres <br />Terrace Slope: <br />4. 12.5 lb. seed at 34.27/acre 34.27 <br />5. Labor and Equipment cost: $35.00/acre 35.00 <br />6. Acreage affected: 14.8 acres 1,025.00 <br />TOTAL COST OF RECLAMATION $57,827.00 <br />10$ Administrative Cost 5,783.00 <br />TOTAL COST FOR BONDING PURPOSES $63,610.00 <br />