My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE46297
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE46297
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:48:31 PM
Creation date
11/20/2007 12:42:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Permit File
Doc Date
11/8/1988
Section_Exhibit Name
APPENDIX N TECHNICAL SPECIFICATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />i The distribution of materials within any given zone shall be <br />such that the fill is free from lenses, pockets, streaks, or layers <br />1 of material differing substantially in texture or gradation from <br />the surrounding material. The combined borrow excavation and fill <br />' placement operation shall be such that the materials, when <br />compacted in the fill, will be blended sufficiently to secure the <br />' best practicable distribution of the material, subject to the <br />approval of the Engineer. <br />' Unless otherwise approved by the Engineer, the top of the fill <br />shall be at or near the same elevation at all times during <br />' construction; the maximum permissible difference in elevation <br />across the fill shall be 1.5 ft. At all times during construction, <br />' the surface of the fill shall be graded to prevent ponding of water <br />and maintained to drain water. <br />' E <br />i <br />d b <br />t <br />th <br />ifi <br />d <br />th i <br />E <br /> erw <br />xcep <br />as o <br />se spec <br />or approve <br />y <br />e <br />e ng <br />neer, <br /> fill shall be dumped and spread in such a manner so tfia t no gaps <br /> are left between successively-dumped loads of materials. The fill <br /> shall be leveled prior to compaction by means of a dozer or grader, <br /> or other suitable approved equipment, to obtain a surface free from <br /> depressions. The fill shall be compacted parallel to the axis of <br />' the fill; and as far as practical, hauling units shall be so routed <br /> that they do not follow in the,same paths but spread their tracks <br /> evenly over the surface of the fill to assist the compaction <br />' operations. Unless otherwise specified or approved by the Engineer, <br /> the Contractor shall not be permitted to end-dump fill materials <br />' into depressions in the foundations or to blade fill down slopes to <br /> fill depressions. <br />' <br /> Unless otherwise approved by the Engineer, the slope of <br />' compacted soil faces against which compacted fill is to be placed <br /> shall not be steeper than 1.5 horizontal to 1.0 vertical. <br /> <br />1 <br />N-11 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.